What is Developing? Open the mapMap

Feature · Konda Bitragunta, Andhra Pradesh — 20 sq. km.

Critical Mineral Assessment Programme in Konda Bitragunta, Andhra Pradesh

GSI is assessing rare earth and critical mineral potential across a 20 sq. km block in Konda Bitragunta, Andhra Pradesh, following promising preliminary exploration results.

Where it stands: Critical Mineral Assessment Programme for assessing the potentiality of laterites in… — “Initial checks” since 17 Nov 2026. Status data as of 27 Nov 2026, 6:36 am IST.

GSI identifies promising rare earth mineralization

The Geological Survey of India (GSI), State Unit Andhra Pradesh, has taken up a critical mineral assessment programme in the Konda Bitragunta area following encouraging results from exploration conducted during the 2024–25 field season. The investigation aims to assess the potential for secondary enrichment of rare earth elements (REEs) and other critical minerals within laterites and lateritic soils.

Previous exploration identified potential mineralization zones south of Konda Bitragunta–Pata Bitragunta, west of Kotthuru and north of Bogole village. Geological mapping at a scale of 1:12,500, along with surface sampling, pitting and trenching, helped delineate the prospective areas.

High rare earth element concentrations reported

Exploration samples returned total rare earth element (TREE) concentrations of up to 87,000 parts per million (ppm), equivalent to 8.7%, in stream sediments. Reported concentrations reached 11,000 ppm (1.1%) in soils and 3,000 ppm in channel and groove samples. Selected channel and bedrock samples from lateritic formations also recorded vanadium concentrations of up to 1,880 ppm.

The geological and geochemical characteristics of the lateritic profiles are consistent with potential ionic adsorption-type REE mineralization. These findings provide a basis for further investigation, although the reported concentrations do not independently establish the grade or economic viability of a mineral deposit.

Further investigation planned across 20 sq. km

The current programme will assess the continuity of laterite formations and the distribution of secondary critical mineral enrichment beneath the surface. Initial work includes collecting bedrock samples from previously identified anomalous zones to verify the earlier results.

Systematic pitting and trenching will also be carried out to expose lateritic horizons and evaluate mineralization at depth. The findings will help determine whether further exploration, including drilling, is warranted.

Of the proposed 20 sq. km block, approximately 6 sq. km falls within Bitragunta Reserved Forest. GSI has highlighted the area's potential significance for critical mineral exploration, noting that successful confirmation through drilling could contribute to India's mineral resource base and generate revenue for the Government of Andhra Pradesh.

The project remains at the assessment stage. Further exploration and drilling are required to establish the extent, continuity and commercial potential of the reported mineralization.

Filings for this project

FilingApproval soughtStatusFiledStatus since
Critical Mineral Assessment Programme for assessing the potentiality of…
New project · Bitragunta, Bogole, Sri Potti Sriramulu Nellore
Forest land useInitial checks16 Nov 202617 Nov 2026

Statuses update automatically twice a day.

About this page

Written and maintained by Akshay Syam. Filing statuses are compiled from publicly available approval records and refresh twice a day; a filing is not an approval. About our methods · Spotted a mistake? Tell us.