Hindalco Industries Limited proposes to develop the Meenakshi Coal Mine, a 12 million metric tonnes per annum (MMTPA) opencast coal mining project in the Ib Valley Coalfield. The project is located across the villages of Kiripashira, Garjanabahal, Bangurakela, and the Jhatikhol and Dhokar Pahar Reserve Forests in Hemgir tehsil, Sundargarh district, Odisha. The project is estimated to cost ₹1,876 crore. The proposal is currently under environmental review, and a request for forest clearance is pending with more information requested by authorities.
| Item | Detail |
|---|---|
| Applicant | Hindalco Industries Limited |
| Capacity | 12 MMTPA |
| Estimated cost | ₹1,876 crore |
| Total land | 577.58 hectares |
| Forest land | 186.489 hectares |
| Life of mine | 28 years |
What is planned
According to the pre-feasibility report and environmental impact assessment (EIA) summary, Hindalco plans to extract coal using fully mechanized opencast mining methods. The operation will utilize surface miners, front-end loaders, and dumpers for coal extraction, alongside shovel-dumper combinations for overburden removal.
The mine has a net geological reserve of 285.24 million tonnes, of which 224 million tonnes are extractable. The project has a proposed life of 28 years, which includes 23 years of active production, three years for post-mining closure, and two years for post-closure monitoring.
Where it is and the land
The project is situated in the north-western part of the Ib Valley Coalfield in Sundargarh district. While the core mining lease covers 486.44 hectares, the total land requirement for the project is 577.58 hectares. This includes 83.37 hectares for a proposed railway corridor and 7.772 hectares for a 33 KV transmission power line.
The total project area requires the diversion of 186.489 hectares of forest land. The mining lease area itself encompasses private tenancy land, government non-forest land, and forest land. The project will displace residents, with documents identifying 557 Project Displaced Families who will require resettlement and rehabilitation.
Cost, jobs and schedule
The estimated project cost is ₹1,876 crore. The mine is expected to generate employment for approximately 1,087 people. This includes 90 direct employees of Hindalco, 947 personnel engaged through a Mine Developer and Operator (MDO), and 50 other contractual workers.
Water, power and connectivity
The project requires 2,778 kilolitres per day (KLD) of water, which will be sourced from groundwater, mine sump water, and harvested rainwater. Power requirements are estimated at 10 MW, which will be drawn from the Odisha Power Transmission Corporation Limited (OPTCL) grid via a 33 KV overhead transmission line.
For coal evacuation, the applicant proposes to initially use road transport. Eventually, a dedicated railway corridor will be established, connecting to the South Eastern Railway network, to handle the major share of coal transport.
Environmental concerns and safeguards
The mining operation is expected to generate 258.62 million cubic meters of overburden over its lifespan. According to the EIA summary, overburden will initially be stored in an external dump before being used for internal backfilling starting in the third year.
At the end of the mine's life, 322.84 hectares of the excavated area will be backfilled and reclaimed with plantation, while a void of 118.84 hectares will be converted into a water reservoir. The applicant plans to develop a greenbelt over 248.87 hectares. A capital budget of ₹48.06 crore, along with a recurring annual budget of ₹5.25 crore, has been allocated for environmental protection measures, including dust suppression systems, sewage treatment plants, and effluent treatment plants.
What was said at the public hearing
A public hearing was held on September 11, 2026, at the Kiripsira Football Ground, attended by 543 participants. Local residents and representatives raised concerns about air and water pollution, the depletion of groundwater, and the loss of traditional forest resources like Kendu and Mahua.
Participants strongly demanded fair compensation, proper resettlement facilities, and direct employment opportunities for project-affected families. In response, Hindalco representatives assured the public that strict pollution control measures would be implemented. The company committed to a ₹21.115 crore budget for community development initiatives, including education, healthcare, and infrastructure, and promised to develop a resettlement colony with basic civic amenities.
Approvals so far
The project received its Terms of Reference for the environmental assessment in May 2026. The application for environmental clearance is currently under review. A separate application for the diversion of 186.489 hectares of forest land was filed in February 2026, and authorities have requested more information from the applicant.
Filings for this project
| Filing | Approval sought | Status | Filed | Status since |
|---|---|---|---|---|
| Meenakshi Coal Mine New project · Sareikela, Hemgir, Sundargarh | Forest land use | More information requested | 9 Feb 2026 | 15 Oct 2026 |
| Meenakshi Coal Mine Early planning · Forest, Hemgir, Sundargarh | Environmental approval | Under environmental review | 17 Feb 2026 | 3 Aug 2026 |
| Meenakshi Coal Mine New project · Bangurakela, Hemgir, Sundargarh | Environmental approval | Under environmental review | 17 Oct 2026 | 26 Nov 2026 |