What is Developing? Open the mapMap

Feature · Kochi, Kerala

Cochin Port Authority Plans ₹838-Crore Dredging at ICTT in Kochi, Kerala

The Cochin Port Authority plans to dredge 24.06 million cubic meters of seabed to deepen the navigational channel at the International Container Transshipment Terminal in Kochi, Kerala, costing ₹838.6 crore.

Where it stands: Capital Dredging for Deepening of Channels for Accepting Vessels Up to 18 M Draught at… — “Under environmental review” since 10 Nov 2026. Status data as of 27 Nov 2026, 6:36 am IST.

The Cochin Port Authority proposes to deepen the navigational channel, turning circle, and berth pockets at the International Container Transshipment Terminal (ICTT) in Fort Kochchi village, Kochi sub-district, Ernakulam district, Kerala. The project aims to increase the draft from 14.5 meters to 18 meters to accommodate larger container vessels. According to the application, the dredging project will cost ₹838.6 crore and covers a marine area of 474.11 hectares (1,171.5 acres). The proposal is currently under environmental review for its Terms of Reference.

ItemDetail
ApplicantCochin Port Authority
LocationFort Kochchi, Ernakulam, Kerala
Project area474.11 hectares (1,171.5 acres)
Capital dredging24.06 million cubic meters
Backlog dredging11.11 million cubic meters
Estimated cost₹838.6 crore
Target draft18 meters

What is planned

The ICTT at Vallarpadam, commissioned in February 2011, currently operates with a 600-meter quay and a 14.5-meter draft. The pre-feasibility report notes that the terminal has a capacity of 1.2 million TEUs (twenty-foot equivalent units) per year and handled 0.84 million TEUs in 2024-25. The terminal currently supports gateway container operations, transshipment, and feeder vessel operations, and is connected to the mainland by road and rail networks.

The current draft restricts the terminal from directly handling modern ultra-large container vessels, which require drafts between 15.5 meters and 18 meters. To address this, the applicant plans to dredge the existing navigational channel, berth pocket, and turning circle to achieve an 18-meter draft. This will allow the port to handle vessels up to 400 meters in length and 62 meters in beam.

The project requires 24.06 million cubic meters of capital dredging and the removal of 11.11 million cubic meters of backlog dredged material.

Where it is and the land

The project is located in the marine area of the Cochin Port in Kerala's backwaters and the Arabian Sea. According to the land details document, the proposed works are confined entirely within the existing marine facilities and navigational waters.

The applicant states that no new land acquisition, reclamation, or expansion of the terminal area is involved. Because the activities are limited to marine dredging works, no rehabilitation or resettlement is required.

Cost

The total estimated cost of the dredging project is ₹838.6 crore. According to the pre-feasibility report, this includes ₹514.03 crore for capital dredging, ₹119.54 crore for backlog removal, as well as mobilization costs, contingencies, and GST.

Environmental concerns and safeguards

The pre-feasibility report identifies that dredging activities will likely impact the marine environment and ecosystem. A baseline environmental study is proposed within a 10-kilometer radius, which includes ecologically sensitive areas such as the Mangala Vanam Bird Sanctuary, a Coastal Vulnerability Conservation Area (CVCA), and mangrove patches.

The baseline study will collect seawater and seabed sediment samples from twelve locations to test for heavy metals, petroleum hydrocarbons, and nutrients. It will also document existing fishery resources, fish landing centers, and the local community's dependence on marine resources.

Morphodynamic modeling predicts that the average siltation rate in the basin is 0.04 to 0.05 meters per 14 days, which increases by 60% to 80% during the monsoon season. The modeling suggests a 20% to 40% overall increase in siltation after the proposed dredging is implemented. The applicant states that the stable shoreline around the jetty, which is protected by dense vegetation, will not require additional shore protection.

Approvals so far

The original ICTT project received environmental clearance in November 2006, which was amended in November 2007 to include widening and deepening of the channel and berth basin. The terminal operator, India Gateway Terminal Pvt Ltd, holds an integrated consent to operate from the Kerala State Pollution Control Board, which is valid until May 30, 2028.

The current capital dredging proposal is under environmental review to obtain Terms of Reference for a new Environmental Impact Assessment study.

Filings for this project

FilingApproval soughtStatusFiledStatus since
Capital Dredging for Deepening of Channels for Accepting Vessels Up to 18 M…
Early planning · Fort Kochchi, Kochi, Ernakulam
Environmental approvalUnder environmental review24 Oct 202610 Nov 2026

Statuses update automatically twice a day.

About this page

Written and maintained by Akshay Syam. Filing statuses are compiled from publicly available approval records and refresh twice a day; a filing is not an approval. About our methods · Spotted a mistake? Tell us.