BPCL proposes an integrated refinery and petrochemical complex
Bharat Petroleum Corporation Limited (BPCL), a central public sector undertaking, has proposed a greenfield refinery and petrochemical complex at Chevuru village in Gudlur mandal, Nellore district, Andhra Pradesh. According to the project's pre-feasibility report, the facility is designed to process 9 million metric tonnes of crude oil annually and produce transportation fuels and a range of petrochemical products.
The proposed complex combines refining operations with downstream manufacturing facilities, including units for polypropylene, polyethylene, polyvinyl chloride (PVC), phenol, cumene and synthetic rubber-related products. The planned configuration is intended to integrate fuel production with the manufacture of industrial chemicals and polymers.
Infrastructure and utility requirements
The pre-feasibility report outlines substantial infrastructure requirements for the proposed facility. Power demand is estimated at approximately 600 MW, including a proposed 100 MW captive power plant. Operational water demand is estimated at around 9,000 cubic metres per hour, to be met through a proposed desalination plant.
The project also envisages extensive wastewater treatment and reuse infrastructure. The report estimates process effluent generation at approximately 2,752 cubic metres per hour, with a portion of the treated water intended for reuse in cooling, fire-water systems and other operations.
Planned connection to Ramayapatnam Port
A key component of the proposed development is its planned connection to Ramayapatnam Port. BPCL's pre-feasibility report envisages a coastal crude oil terminal supplied by vessels through a single-point mooring system and subsea pipelines.
The report also identifies marine infrastructure for crude oil receipt, product dispatch and LNG/LPG handling at the port. Finished refinery and petrochemical products are envisaged to move through domestic road and rail networks, with exports transported by sea.
The refinery and port remain distinct project filings, but their planned logistics arrangements indicate a potential infrastructure relationship that could support industrial activity in the surrounding coastal region.
Project status and next steps
The supplied document is a pre-feasibility report describing the proposed capacity, configuration, utilities and supporting infrastructure. It specifies a commissioning schedule of 42 months from the award of the project management or engineering, procurement and construction management consultancy.
However, the supplied report does not establish that construction has commenced, that all required environmental approvals have been obtained or that the commissioning schedule is currently in effect. The project's implementation status and approval milestones would need to be verified through subsequent official filings.
Filings for this project
| Filing | Approval sought | Status | Filed | Status since |
|---|---|---|---|---|
| Greenfield Non-Major Port at Ramayapatnam Expansion · Chevuru, Gudluru, Sri Potti Sriramulu Nellore | Environmental approval | Environmental approval granted | 16 Mar 2023 | 16 Apr 2026 |
| 9 MMTPA Greenfield Refinery and Petrochemical Complex by BPCL New project · Chevuru, Gudluru, Sri Potti Sriramulu Nellore | Environmental approval | Environmental approval granted | 8 May 2026 | 27 Oct 2026 |
Statuses update automatically twice a day.
About this page
Written and maintained by Akshay Syam. Filing statuses are compiled from publicly available approval records and refresh twice a day; a filing is not an approval. About our methods · Spotted a mistake? Tell us.