Kalisindh Power Project: An 800 MW Expansion in Jhalawar

Rajasthan Rajya Vidyut Utpadan Nigam Ltd proposes an 800 MW expansion to the Kalisindh thermal power plant in Jhalawar, Rajasthan, costing ₹11,307 crore.

Where it stands: 1 X 800 MW Ultra Superritical Kalisindh Coal Fired Thermal Power Project — “Lapsed” since 21 Nov 2026. 2 related filings are listed below. Status data as of 27 Nov 2026, 6:36 am IST.

Rajasthan Rajya Vidyut Utpadan Nigam Ltd proposes to build an 800 MW coal-fired thermal power plant expansion at the existing Kalisindh Thermal Power Station. The project is located in Devrimotipura and Nimoda villages, Jhalrapatan sub-district, Jhalawar district, Rajasthan. The expansion is estimated to cost ₹11,307.67 crore. According to the project's filings, the application for environmental clearance is currently listed as lapsed.

ItemDetail
Capacity800 MW
Estimated cost₹11,307.67 crore
Land required106.32 hectares (262.71 acres)
Coal requirement3.83 million tonnes per annum
Water requirement1,766 cubic meters per hour

What is planned

According to the pre-feasibility report filed with the application, the applicant plans to add a single 800 MW ultra-supercritical unit (Unit #3) to the existing 1,200 MW (2x600 MW) power station. The ultra-supercritical technology operates at higher temperatures and pressures than conventional plants, which the applicant states will improve thermal efficiency and reduce coal consumption per megawatt.

The plant will require 3.83 million tonnes per annum of domestic coal, assuming an 85% plant load factor. The coal is proposed to be sourced from captive coal blocks in Chhattisgarh or from South Eastern Coalfields Limited (SECL) / Northern Coalfields Limited (NCL). The project will also use secondary fuels, including Light Diesel Oil (LDO) and Low Sulphur Heavy Stock (LSHS), for start-up and low-load operations.

Where it is and the land

The expansion is located in the Jhalrapatan sub-district of Jhalawar, Rajasthan. According to the latest filing facts, the project requires 106.32 hectares (262.71 acres) of land. The pre-feasibility report notes that the expansion will be built within the existing premises of the Kalisindh Thermal Power Station, utilizing land already designated for industrial use. No additional land acquisition or displacement of people is required. The site is located approximately 11 kilometers from Jhalawar city.

Cost, jobs and schedule

The most recent filing estimates the project cost at ₹11,307.67 crore. The pre-feasibility report outlines a construction schedule of 45 months from the zero date (the date the work order is placed).

During the construction phase, the project is expected to employ about 100 permanent workers and 1,000 temporary workers. Once operational, the plant will require an estimated 194 permanent employees and 500 temporary workers.

Water, power and connectivity

The plant will require 1,766 cubic meters per hour (46,563 kiloliters per day) of water. The Water Resources Department of the Government of Rajasthan has allocated water for the unit from the Kalisindh Dam, located about 13.5 kilometers away. Water will be transported through a new pipeline laid alongside the existing one.

Coal will be transported to the site via the existing railway network, utilizing the current marshalling yard and wagon tipplers. Power generated by the new unit will be stepped up to 400 kV and evacuated through a new switchyard connected to the state grid.

Environmental concerns and safeguards

The combustion of coal will generate an estimated 1.57 million tonnes of ash annually (80% fly ash and 20% bottom ash). The applicant proposes a 100% ash utilization plan, supplying fly ash to cement and brick manufacturing industries. Unused ash will be disposed of in an ash pond using a high-concentration slurry disposal system.

To control air pollution, the project includes a 275-meter-high chimney and electrostatic precipitators (ESP) designed to keep particulate matter emissions below 30 mg/Nm3. The plant will also install low NOx burners and a Selective Catalytic Reduction (SCR) system to control nitrogen oxide emissions. The applicant states the plant will operate on a "zero liquid discharge" concept, treating and recycling all industrial and domestic wastewater for use in greenbelt development and ash handling.

What was said at the public hearing

A public hearing for the project's environmental clearance was held on October 15, 2024, at the project site. According to the minutes and submitted representations, local residents and representatives raised several concerns regarding the existing plant and the proposed expansion.

Key issues included severe fly ash pollution affecting local air quality, agricultural fields, and water bodies, particularly the village pond in Nimoda. Residents complained that the existing plant's ash disposal practices were inadequate and causing health issues. Villagers also stated that promised Corporate Social Responsibility (CSR) initiatives, such as drinking water supply, road repairs, and local employment, had not been fulfilled. Representatives from the project responded that pollution control equipment was being upgraded, ash utilization was being maximized, and CSR funds were being allocated for local water and infrastructure projects.

Approvals so far

The project received clearance for its Terms of Reference (ToR) to conduct an environmental impact study in November 2023. According to the latest filing records, the current status of the environmental clearance application is lapsed.

Filings for this project

FilingApproval soughtStatusFiledStatus since
1 X 800 MW Ultra Superritical Kalisindh Coal Fired Thermal Power Project
Early planning · Devrimotipura, Jhalrapatan, Jhalawar
Environmental approvalCleared for impact study23 Nov 202323 Nov 2023
1 X 800 MW Ultra Superritical Kalisindh Coal Fired Thermal Power Project
Expansion · Devrimotipura, Jhalrapatan, Jhalawar
Environmental approvalLapsed17 Nov 202621 Nov 2026