Marine Infrastructure Developer Private Limited is proposing an expansion of the Kattupalli Port in Kattupalli village, Ponneri sub-district of Thiruvallur district, Tamil Nadu. The project, estimated to cost ₹2,566 crore, will be developed over 136.28 hectares (336.75 acres) of land. The proposal is currently under coastal review.
| Item | Detail |
|---|---|
| Applicant | Marine Infrastructure Developer Private Limited |
| Location | Kattupalli, Thiruvallur, Tamil Nadu |
| Project Area | 136.28 hectares (336.75 acres) |
| Estimated Cost | ₹2,566 crore |
| Current Status | Under coastal review |
What is planned
According to the draft Environmental Impact Assessment (EIA) report filed with the application, the expansion facilities will be developed entirely within the existing Kattupalli port area. The document explicitly states that marine side construction is not envisaged in this proposed expansion. Consequently, there will be no new capital dredging, land reclamation, or construction of additional berths. The port's operations will involve the continuous, round-the-clock movement of cargo vessels and port crafts. The cargo will be handled using specialized hoisting equipment to minimize the risk of spills, and stack yards are planned on the down-drift side to avoid wind drift.
Where it is and the land
The expansion project is situated in Kattupalli village, Ponneri sub-district, Thiruvallur district, Tamil Nadu. The project area spans 136.28 hectares (336.75 acres). According to a supplementary document filed with the application, no tree cutting is envisaged for the proposed expansion.
Water, power and connectivity
To manage water and effluents, the port will rely on a combination of existing and new infrastructure. The draft EIA report notes that sewage generated from the port will be treated in existing sewage treatment plants (STPs) that have capacities of 30 KLD (kilolitres per day), 10 KLD, and 5 KLD. Furthermore, effluent generated during the proposed development will be treated in a new 50 KLD effluent treatment plant (ETP). Treated sewage will be distributed to maintain the greenbelt area within the port. Pipe drains, covered box drains, and open drains are planned across the stockyards, workshops, and access roads to manage storm water runoff, which will be directed to a settling tank before discharge.
Environmental concerns and safeguards
The applicant's draft EIA report details multiple safeguards to address potential ecological impacts during the port's operation.
- Marine Water Quality: Ships visiting the port are prohibited from dumping waste or bilge water during berthing. The port provides reception facilities for ship residues in accordance with the MARPOL convention. Oily wastewater from fuel tanks, ships' bilge water, and maintenance shops will pass through an oil-water separator before discharge.
- Maintenance Dredging: While no new dredging is planned, the existing port requires annual maintenance dredging of 0.98 MCM (million cubic metres) to maintain the required draft in the approach channel. The dredged material is disposed of at an identified location at sea.
- Oil Spills: The port maintains an Oil Spill Contingency Plan (OSCP) integrated with the District Oil Spill Disaster Contingency Plan. This framework includes response mechanisms, control methods, and sensitivity mapping to combat accidental spills during bunkering or vessel collisions.
- Ballast Water Management: To prevent the introduction of invasive marine species, ships must conduct ballast water exchange at least 200 nautical miles from the nearest land in water at least 200 meters deep, achieving a 95% volumetric efficiency.
- Air Quality and Noise: Air dispersion modelling indicates that incremental pollutant concentrations will remain within the National Ambient Air Quality Standards. Mitigation measures include covering cargo trucks with tarpaulins and ensuring vehicles have pollution under control certificates. For noise control, acoustic enclosures and vibration dampers will be installed on noisy equipment, and workers will be provided with earplugs or muffs.
- Solid Waste: Municipal solid waste from the canteen and administrative areas is estimated at 0.16 TPD (tonnes per day). Biodegradable waste will be composted and used as manure for the port's green belt, while hazardous wastes will be handled by authorized vendors.
Approvals so far
The application for coastal clearance was filed on October 28, 2026. The project is currently under coastal review.
Filings for this project
| Filing | Approval sought | Status | Filed | Status since |
|---|---|---|---|---|
| Environmental/CRZ Clearance for Expansion of Kattupalli Port Expansion · Kattupalli, Ponneri, Thiruvallur | Coastal review | Under coastal review | 28 Oct 2026 | 28 Oct 2026 |
Statuses update automatically twice a day.
About this page
Written and maintained by Akshay Syam. Filing statuses are compiled from publicly available approval records and refresh twice a day; a filing is not an approval. About our methods · Spotted a mistake? Tell us.