Nayara Energy Seeks to Amend Clearance for its 60-Million-Tonne Refinery Expansion in Gujarat

Nayara Energy Limited has applied to amend the environmental clearance for expanding its refinery to 60 million metric tonnes per annum in Gujarat.

Where it stands: EC amendment for expansion of Refinery capacity from 9 MMTPA to 60 MMTPA with… — “More information requested” since 1 Nov 2026. Status data as of 27 Nov 2026, 6:36 am IST.

Nayara Energy Limited proposes to amend the environmental clearance for the expansion of its refinery capacity to 60 MMTPA (million metric tonnes per annum) and the development of a petrochemical complex. According to the application facts, the project is located in Zankhar village, Lalpur sub-district, Jamnagar district, Gujarat, though the environmental impact assessment addendum places the site at Vadinar village in Khambhalia tehsil, Devbhumi Dwarka district. The project covers 2,275 hectares (5,621 acres). The current filing lists a cost of ₹535.39 crore. The application for an environmental clearance amendment is currently pending, with more information requested.

ItemDetail
ApplicantNayara Energy Limited
Proposed Capacity60 MMTPA
Total Land2,275 hectares (5,621 acres)
Water Requirement221.3 MLD
Power Requirement199 MW
Estimated Cost₹535.39 crore

What is planned

The applicant is seeking an amendment to the conditions of an older environmental clearance originally granted for expanding the refinery from 9 MMTPA to 60 MMTPA. The addendum to the environmental impact assessment report states that the refinery currently operates at a 20 MMTPA capacity. The original clearance was granted in 2007 to Essar Oil Limited, later bifurcated, and transferred to Nayara Energy Limited in 2018. Because the full 60 MMTPA expansion could not be implemented within the validity period, the company is now seeking to amend specific conditions of that clearance.

According to the addendum, the company wants to amend conditions related to emission controls. For example, it proposes using multi-stage cyclone separators instead of electrostatic precipitators for its fluidized catalytic cracker units, arguing that cyclone separators are widely accepted for capturing catalyst fines. It also seeks to align its gaseous and volatile organic compound emission standards with specific government notifications for petroleum oil refineries.

Where it is and the land

The total project area is 2,275 hectares (5,621 acres). The addendum notes this comprises 1,171 hectares (2,893 acres) for the existing refinery and 1,104 hectares (2,728 acres) for the petrochemical expansion. A greenbelt has been developed over 410 hectares (1,013 acres) of the plant area. The document states that there is no further land requirement for the project.

Cost, jobs and schedule

The application facts state a project cost of ₹535.39 crore. According to the addendum, the operational phase of the existing facility employs 1,509 permanent workers and 5,889 temporary or contract workers.

Water, power and connectivity

The addendum states that the refinery requires 221.3 MLD (million litres per day) of seawater, which is sourced from the Gulf of Kutch via a 44-inch pipeline. Power requirements stand at 199 MW, which is met by a captive power plant that uses coal, natural gas, and fuel oil.

Crude oil is received via a single point mooring system capable of handling very large crude carriers. This mooring system is located 8.4 kilometres from the shore and connects to the crude oil tank farm via a 48-inch pipeline. Finished products are dispatched by rail, road tankers, pipelines, and a product jetty located on the Pathfinder Creek.

Environmental concerns and safeguards

The addendum details that 144.9 MLD of saline water, including desalination brine and cooling tower blowdown, is discharged into the sea through a 52-inch pipeline and a diffuser system. Process wastewater generation is 27.1 MLD, which is treated in an effluent treatment plant and reused for cooling tower makeup, horticulture, and fire water.

Air pollution control measures outlined in the documents include the installation of low nitrogen oxide burners in all heaters and furnaces, sulphur recovery units with an efficiency of more than 99.9 percent, and floating roof tanks with double seals to reduce hydrocarbon vapour loss. All vent offs are connected to a flare system to manage emergency releases.

Approvals so far

The project's application for an environmental clearance amendment is currently at the stage where more information has been requested.

Filings for this project

FilingApproval soughtStatusFiledStatus since
EC amendment for expansion of Refinery capacity from 9 MMTPA to 60 MMTPA with…
Amendment · Zankhar, Lalpur, Jamnagar
Environmental approvalMore information requested16 Oct 20261 Nov 2026