The Singareni Collieries Company Limited (SCCL) is operating the Shanti Khani Longwall underground coal mining project in Aknepalli village, Bellampally mandal of Mancherial district, Telangana. The project is designed to produce 1.167 million metric tonnes per annum (MMTPA) of coal. According to the pre-feasibility report filed with the application, the project is estimated to cost ₹307.84 crore. The project was granted environmental approval in October 2026.
| Item | Detail |
|---|---|
| Applicant | The Singareni Collieries Company Limited |
| Capacity | 1.167 million metric tonnes per annum |
| Project area | 681.23 hectares (1,683.3 acres) |
| Estimated cost | ₹307.84 crore |
| Employment | 502 persons |
| Mine life | 9 years |
What is planned
According to the applicant's pre-feasibility report, the project is an expansion and modernization of the existing Shanti Khani Incline. The mine uses mechanized Longwall and Continuous Miner technologies to extract coal from the Salarjung seam. The extracted coal is transported to the surface via a series of belt conveyors to pre-weigh bin bunkers, and then to a coal handling plant for dispatch to power plants, cement industries, and other consumers.
Where it is and the land
The project is located near Aknepalli village in the Bellampally mandal of Mancherial district, Telangana. The total mine take area is 681.23 hectares (1,683.3 acres). According to the pre-feasibility report, this includes 484.94 hectares (1,198.2 acres) of forest land and 196.29 hectares (485 acres) of non-forest land. The non-forest land comprises agricultural land, grazing land, and wastelands.
Cost, jobs and schedule
The estimated capital cost of the project is ₹307.84 crore. The pre-feasibility report states that the average daily manpower required to operate the mine is 502 persons. The balance life of the mine is estimated at 9 years from 2024-25, with about 8.696 million tonnes of extractable reserves remaining as of April 2024.
Water, power and connectivity
During mining operations, groundwater accumulates in the mine due to natural seepage. According to the pre-feasibility report, about 2,950 kilolitres per day (KLD) of water is pumped out. This water is filtered and used for drinking, mine spraying (250 KLD), domestic use in SCCL colonies (1,500 KLD), and greenbelt development (165 KLD), with the remaining 1,035 KLD let out for agricultural use. A No Objection Certificate from the Ground Water Department permits the dewatering of 2,950 cubic metres per day.
The project requires 10.6 MVA of power, which is supplied from an existing 132/33KV SCCL sub-station located 10 kilometres away. The mine is connected to Bellampally town by a 4-kilometre all-weather road, and the nearest railway station is Bellampally, 4 kilometres away.
Environmental concerns and safeguards
The environmental impact assessment report identifies potential impacts such as dust generation, noise, and water pollution. To mitigate these, the applicant proposes water sprinkling systems, effluent treatment plants, and the development of a greenbelt. The solid waste generated, such as stone and shale, is used for underground track ballasting and leveling. The report also notes that subsidence is a risk factor in underground mining, and strata management measures are implemented to address it.
What was said at the public hearing
A public hearing was held on 6 March 2025 near the Shanti Khani mine site. According to the minutes of the meeting, local residents requested employment for unemployed youth, skill development training, and improvements to educational facilities, roads, drains, and street lighting. They also asked for drinking water supply and the treatment of excess mine water for irrigation.
In response, SCCL representatives stated that local persons are engaged in contractual operations. The company committed to spending ₹80 lakh over eight years for skill development, ₹25 lakh over five years for educational facilities, and ₹30 lakh over three years for road and drain improvements. SCCL also allocated funds for solar street lighting, water supply infrastructure, and regular medical camps.
Approvals so far
The project was granted environmental approval on 26 October 2026. A previous filing for expansion lapsed in August 2026. The project also received a No Objection Certificate for groundwater extraction valid from September 2025 to September 2027.
Filings for this project
| Filing | Approval sought | Status | Filed | Status since |
|---|---|---|---|---|
| Shanti Khani Long wall Underground Coal mining Project Expansion · Gurjala, Bellampally, Mancherial | Environmental approval | Lapsed | 18 Apr 2026 | 4 Aug 2026 |
| Shanti Khani Long wall Underground Coal mining Project Amendment · Aknepalli, Bellampally, Mancherial | Environmental approval | Environmental approval granted | 12 Aug 2026 | 26 Oct 2026 |