Project details
| Official title | Construction of 04-Lane Major Bridge for Connectivity of Sri Vijaya Puram (Earlier Known As Port Blair) and Bambooflat Including 2 No. Extradosed Navigational Span of 232m Each (Total Length of 4.332 Km) in the Union Territory of Andaman & Nicobar Islands on Epc Mode |
|---|---|
| Status | Lapsed |
| Status since | 18 Oct 2026 |
| Application filed | 2 Mar 2025 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Ashok Kumar Rolaniya |
| Project cost | ₹1,636 crore |
| Village / locality | Port Blair |
| Taluk / tehsil | Port Blair |
| District | South Andaman |
| State | Andaman and Nicobar Islands |
| Location from | Site boundary on record |
| Our reference | WID-AN-00131 |
In context
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Port Blair, South Andaman, Andaman and Nicobar Islands. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gas Supply Infrastructure for Power Project at Sri Vijayapuram, Hopetown — cleared for impact study, 650 m away
- Gas Supply Infrastructure for Power Project at Sri Vijayapuram, Hopetown — lapsed, 700 m away
- 57.105 MW Single Fuel (LNG) based Power Project at Hope Town (V), Ferrargunj… — under environmental review, 700 m away
- Proposed redevelopment of existing Megapode Hotel Resort at Sri Vijaya Puram,… — coastal clearance granted, 2.7 km away
- 60MW Floating Solar Photovoltaic (PV) Power Plant — under coastal review, 3.2 km away
- Proposed development of Viper Island — lapsed, 5 km away
- Proposed development of Netaji Subhas Chandra Bose (NSCB) Island — under coastal review, 5.2 km away
- 40MW ground-based Solar Photovoltaic (PV) Power Plant — more information requested, 6.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.