Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Chellu Naga Sankara Rao |
| Land area | 5.6 acres (2.3 ha) |
| Project cost | ₹48 lakh |
| Village / locality | Kachavaram |
| Taluk / tehsil | Ibrahimpatnam |
| District | Ntr |
| State | Andhra Pradesh |
| Location from | Site area on record |
| Our reference | WID-AP-00044 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Feb 2024 | Environmental approval granted | 5.6 acres | ₹48 lakh |
| Early planning filed 23 Nov 2023 (this page) | Cleared for impact study | 5.6 acres | ₹48 lakh |
In context
243 applications in Ntr since January 2022 are in the same category (Mining): 182 approved, 31 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.6 acres, this one is smaller than 69% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 30 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 67 mining leases have applied within 5 km.
Where it is
Kachavaram, Ibrahimpatnam, Ntr, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Sri. Ganapathi Stone Crusher — environmental approval granted, 50 m away
- Sri Ch. Naga Sankara Rao – 0.810 Ha — environmental approval granted, 50 m away
- Mining project by M/s Ganapathi Stone Crusher — environmental approval granted, 350 m away
- Mining project by M/s. Machilipatnam Port Limited – 10.000 Ha — cleared for impact study, 500 m away
- Sri N. Uma Maheswara Rao — environmental approval granted, 550 m away
- Mining project by M/s Elite Marketing, Mg. Pt: K. Lakshmi Bandhavi (7.830 Ha) — lapsed, 600 m away
- Mining project by M/s Maruthi Constructions — initial checks, 700 m away
- Mining project by M/s Maruthi Constructions — cleared for impact study, 700 m away
More from Chellu Naga Sankara Rao in Ntr
- Sri Ch. Naga Sankara Rao – 0.810 Ha — environmental approval granted
- Mining project by M/s Ganapathi Stone Crusher — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.