Quick answers
What is this project?
This approved mining project by M/s Vijaya Stone Crusher, Prop: Sri Karanam Vykunta Rao is in Kothavalasa, Salur, Parvathipuram Manyam, Andhra Pradesh. The site covers 17.1 acres.
Who is building it?
The applicant is M/S. Vijaya Stone Crusher, Prop. Sri Karanam Vykunta Rao,.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Sept 2022), as of 27 Nov 2026.
Where is it?
In Kothavalasa, Salur, Parvathipuram Manyam, Andhra Pradesh.
How big is it?
It has a stated cost of ₹75 lakh and a site of 17.1 acres.
When was it filed?
The application was filed on 29 Sept 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Sept 2022 |
| Application filed | 29 Sept 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M/S. Vijaya Stone Crusher, Prop. Sri Karanam Vykunta Rao, |
| Land area | 17.1 acres (6.9 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Kothavalasa |
| Taluk / tehsil | Salur |
| District | Parvathipuram Manyam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00080 |
In context
39 applications in Parvathipuram Manyam since January 2022 are in the same category (Mining): 29 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 17.1 acres, this one is larger than 72% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Kothavalasa, Salur, Parvathipuram Manyam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s Navadurga Mining Infra, Mg.Ptr: Nekkanti Srinivasa Rao — environmental approval granted, 4.9 km away
- M/s Navadurga Mining Infra, Mg.Ptr: Nekkanti Srinivasa Rao — cleared for impact study, 4.9 km away
- M/s Navadurga Mining Infra "Road Metal &Building Stone Mine" — environmental approval granted, 5.1 km away
- Mining project by M/s. SGX Minerals Private Limited — environmental approval granted, 12.1 km away
- Mining project by M/s. SGX Minerals Private Limited — lapsed, 12.1 km away
- Proposed 2500 MW Duggeru Pumped Storage Project (8 x 312.5 MW) Near Duggeru… — lapsed, 19.7 km away
- Mining project by M/s Krishna Exim — environmental approval granted, 22 km away
- Mining project by M/s. Satya Deva Mines and Minerals-4.890 Ha — environmental approval granted, 22.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.