Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Oct 2022 |
| Application filed | 27 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pvengaiah |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹43 lakh |
| Village / locality | Kunchangi |
| Taluk / tehsil | Anakapalle |
| District | Anakapalli |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00124 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 22 Sept 2025 | Environmental approval granted | 4.9 acres | ₹43 lakh |
| New project filed 27 Oct 2022 (this page) | Environmental approval granted | 4.9 acres | ₹43 lakh |
In context
213 applications in Anakapalli since January 2022 are in the same category (Mining): 151 approved, 18 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.9 acres, this one is smaller than 76% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 33.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 22 mining leases have applied within 5 km.
Where it is
Kunchangi, Anakapalle, Anakapalli, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri P. Vengaiah — environmental approval granted, 0 m away
- Mining project by M/s Sri Lakshmi Narasimha Stone Crusher — environmental approval granted, 200 m away
- Mining project by M/s Sri Lakshmi Narasimha Stone Crusher, Prop: Sri P.… — environmental approval granted, 200 m away
- Mining of Road Metal, Building Stone and Gravel, 4.690 Ha of Sri Y.V.… — environmental approval granted, 250 m away
- Smt P. Sri Devi — environmental approval granted, 450 m away
- Smt P. Sri Devi — lapsed, 450 m away
- Mining project by M/s R. K. Minerals — cleared for impact study, 600 m away
- Mining project by M/s R.K Minerals, Mg.P: Sri Sathi Subba Reddy — environmental approval granted, 650 m away