Quick answers
What is this project?
This proposed mining project by M/s Vasavi Ganesh Granites, Prop: Sri Manda Srinivasa Gupta is in Doddukuru, Devarapalle, East Godavari, Andhra Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Srinivasa Manda.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 26 Nov 2022), as of 27 Nov 2026.
Where is it?
In Doddukuru, Devarapalle, East Godavari, Andhra Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 26 Nov 2022.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 26 Nov 2022 |
| Application filed | 26 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Srinivasa Manda |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Doddukuru |
| Taluk / tehsil | Devarapalle |
| District | East Godavari |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00159 |
In context
252 applications in East Godavari since January 2022 are in the same category (Mining): 206 approved, 32 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval. At 2.5 acres, this one is smaller than 93% of them.
7 other mining leases have applied within 500 m of this site; together with this one they cover 43.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 55 mining leases have applied within 5 km.
Where it is
Doddukuru, Devarapalle, East Godavari, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Sai Sri Lakshmi Venkateswara Stone Crusher, Mg.P: Sri T.… — environmental approval granted, 200 m away
- Mining project by M/s Vara Lakshmi Granite and Metals, — environmental approval granted, 250 m away
- Mining project by M/s Vara Lakshmi Granite and Metals, — environmental approval granted, 250 m away
- Mining project by M/s Vara Lakshmi Granite and Metals, — cleared for impact study, 250 m away
- Mining project by M/s SVSM Granites LLP — under environmental review, 300 m away
- Mining project by M/s. Sri Balaji Stone Crusher — environmental approval granted, 350 m away
- Mining project by M/s. Sri Balaji Stone Crusher — cleared for impact study, 350 m away
- Smt. M. Annapurna — environmental approval granted, 450 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.