Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Dec 2022 |
| Application filed | 2 Dec 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jaiprakash Power Ventures Limited, Kadapa |
| Land area | 10.8 acres (4.4 ha) |
| Project cost | ₹3 lakh |
| Village / locality | Nagaladinne |
| Taluk / tehsil | Nandavaram |
| District | Kurnool |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00169 |
In context
99 applications in Kurnool since January 2022 are in the same category (Mining): 69 approved, 11 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10.8 acres, this one is smaller than 63% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 24.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Nagaladinne, Nandavaram, Kurnool, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Nagaladinne Open Sand Reach - 5.363 Ha — environmental approval granted, 50 m away
- Nagaladinne Open Sand Reach - 5.363 Ha — cleared for impact study, 50 m away
- Gangavaram and Joharapuram Open Sand Reach — environmental approval granted, 5.3 km away
- Gangavaram and Joharapuram Open Sand Reach — cleared for impact study, 5.3 km away
- Expansion of Integrated Steel Complex at Madhavaram, Rassamarri Villaages ,… — withdrawn, 20.5 km away
- Transfer of EC from MARUTI ISPAT & ENERGY PVT. LTD. to MARUTI ISPAT & PIPES… — environmental approval granted, 20.6 km away
- For Proposed "increase in Production Capacity of Existing Dri Plant of 4 X 100… — initial checks, 20.6 km away
- Expansion of Integrated Steel Complex — environmental approval granted, 20.6 km away
More from Jaiprakash Power Ventures Limited, Kadapa in Kurnool
- Gudikambali River sand Reach - III — environmental approval granted
- Marali sand Reach-II — environmental approval granted
- Gudikambali River sand Reach - I — environmental approval granted
- Gudikambali River Sand Reach - II — environmental approval granted
- Marali River Sand reache-I — environmental approval granted
6 Jaiprakash Power Ventures projects in Kurnool
All 7 Jaiprakash Power Ventures projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.