Quick answers
What is this project?
Sri K. Sanjeeva Rao Building Stone Quarry over extent of 0.5 Ha is a proposed mining project in Polepalle, Bhogapuram, Vizianagaram, Andhra Pradesh. The site covers 1.2 acres.
Who is building it?
The applicant is Sanjeeva Karrotu.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 1 Dec 2022), as of 27 Nov 2026.
Where is it?
In Polepalle, Bhogapuram, Vizianagaram, Andhra Pradesh.
How big is it?
It has a stated cost of ₹38 lakh and a site of 1.2 acres.
When was it filed?
The application was filed on 1 Dec 2022.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 1 Dec 2022 |
| Application filed | 1 Dec 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Sanjeeva Karrotu |
| Land area | 1.2 acres (0.5 ha) |
| Project cost | ₹38 lakh |
| Village / locality | Polepalle |
| Taluk / tehsil | Bhogapuram |
| District | Vizianagaram |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00218 |
In context
183 applications in Vizianagaram since January 2022 are in the same category (Mining): 141 approved, 6 filed or under review, and 36 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 1.2 acres, this one is smaller than 97% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Polepalle, Bhogapuram, Vizianagaram, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Krishna Plywood Industries — environmental approval granted, 3.1 km away
- Greenfield Bhogapuram International Airport — environmental approval granted, 8.1 km away
- Sri K.Narasimha Rao - 3.90 Ha. — environmental approval granted, 10.8 km away
- Sri K.Narasimha Rao - 0.3 Ha. — environmental approval granted, 10.8 km away
- Ms Sri Venkateswara Constructions and Mining Company — environmental approval granted, 10.9 km away
- Mining project by M/s. GMR Visakhapatnam International Airport Limited — cleared for impact study, 11 km away
- Mining project by M/s. GMR Visakhapatnam International Airport Limited — environmental approval granted, 11 km away
- Sri R. Raghu Ram — lapsed, 11 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.