One of 2 filings for this project. The project's main page, with every filing and where each stands: Smr.A.Saraswathi (ROAD METAL & BUILDING STONE, BALLAST,MORRUM/GRAVEL AND ORDINARY EARTH)
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 23 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ambavaram Saraswathi |
| Land area | 11.8 acres (4.8 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Hill |
| Taluk / tehsil | Kadapa |
| District | Y.S.R. |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00229 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 May 2025 | Environmental approval granted | 11.8 acres | ₹50 lakh |
| Early planning filed 23 Nov 2023 (this page) | Cleared for impact study | 11.8 acres | ₹50 lakh |
In context
139 applications in Y.S.R. since January 2022 are in the same category (Mining): 106 approved, 8 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.8 acres, this one is smaller than 61% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 56.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Hill, Kadapa, Y.S.R., Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Smr.A.Saraswathi (ROAD METAL & BUILDING STONE, BALLAST,MORRUM/GRAVEL AND… — environmental approval granted, 0 m away
- Sri.S.Yella Reddy, Morrum/Gravel/Ordinary Earth -4.464 Ha — environmental approval granted, 250 m away
- Sri.S.Yella Reddy, Morrum/Gravel/Ordinary Earth -4.496 Ha — lapsed, 250 m away
- Smt.G.Nageswari (RMBS/Ballast,Murrun/Gravel and Ordinary Earth) — environmental approval granted, 300 m away
- Smt.G.Nageswari (RMBS/Ballast,Murrun/Gravel and Ordinary Earth) — cleared for impact study, 300 m away
- Sri Mohammad Amanulla — cleared for impact study, 950 m away
- The Kadapa Central Mall & Multiplex by M/s. R Square Motels Resorts and Infra… — environmental approval granted, 5.3 km away
- Environment Clearance for Kadapa Airport by M/s. Airports Authority of India… — lapsed, 9.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.