Quick answers
What is this project?
This approved mining project by M/s Prabath Granites Industries, Mg.Partner: Smt Busupalli Adilakshmi is in Chintamani, Tekkali, Srikakulam, Andhra Pradesh. The site covers 6.2 acres.
Who is building it?
The applicant is Prabhath Granite Industries.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Jun 2023), as of 27 Nov 2026.
Where is it?
In Chintamani, Tekkali, Srikakulam, Andhra Pradesh.
How big is it?
It has a stated cost of ₹40 lakh and a site of 6.2 acres.
When was it filed?
The application was filed on 22 Jun 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Jun 2023 |
| Application filed | 22 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Prabhath Granite Industries |
| Land area | 6.2 acres (2.5 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Chintamani |
| Taluk / tehsil | Tekkali |
| District | Srikakulam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00442 |
In context
286 applications in Srikakulam since January 2022 are in the same category (Mining): 209 approved, 37 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.2 acres, this one is smaller than 80% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 49.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 48 mining leases have applied within 5 km.
Where it is
Chintamani, Tekkali, Srikakulam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Maxim Rocks Pvt Ltd., — under environmental review, 250 m away
- Mining project by M/s. Narvi Infrastructure — environmental approval granted, 300 m away
- Mining project by M/s. Narvi Infrastructure — cleared for impact study, 300 m away
- Mining project by M/s. RAPID ROCKS & MINERALS PVT. LTD. — environmental approval granted, 400 m away
- Mining project by M/s. RAPID ROCKS & MINERALS PVT. LTD. — cleared for impact study, 400 m away
- Mining project by M/s. Free World Exports Private Limited (2.00 Ha.,) — environmental approval granted, 550 m away
- Smt Erigineni Damayanthi — initial checks, 600 m away
- Smt Erigineni Damayanthi — cleared for impact study, 600 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.