Project details
| Official title | Greenfield Project of Grain Based Distillery Plant of 200 KLD (100 KLD in Phase-1 + 100 KLD in Phase-2) along with 6 MW Co-generation Project (3 MW in Phase-1 + 3 MW in Phase-2) by M/s Eco Steel India Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Sept 2023 |
| Application filed | 26 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Eco Steel India Limited |
| Land area | 22.3 acres (9 ha) |
| Project cost | ₹152.1 crore |
| Village / locality | Jajirakallu |
| Taluk / tehsil | D.Hirehal |
| District | Anantpur |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00585 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 26 Jun 2023 (this page) | Environmental approval granted | 22.3 acres | ₹152.1 crore |
| New project filed 21 Apr 2023 | Environmental approval granted | 22.3 acres | ₹152.1 crore |
In context
18 applications in Anantpur since January 2022 are in the same category (Industry): 11 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 22.3 acres, this one is smaller than 100% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jajirakallu, D.Hirehal, Anantpur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Project of Grain Based Distillery Plant of 200 KLD (100 KLD in… — environmental approval granted, 0 m away
- M/S B.B. Minerals, Mg.Part: Smt. N. Aruna (Extension of validity of EC) for… — environmental approval granted, 2.1 km away
- Sri G. Raghavendra — environmental approval granted, 2.2 km away
- Sri.B.Mustaq Hussai — cleared for impact study, 2.5 km away
- Mining of Road Metal & Building Stone and Gravel Mine over an extent of 2.796… — environmental approval granted, 2.5 km away
- Y. Susheela — lapsed, 3.1 km away
- Y.Susheela — environmental approval granted, 3.1 km away
- Mining project by M/s Trimurthy Engineering Constructions — environmental approval granted, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.