Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Nov 2023 |
| Application filed | 30 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Derangula Mallikarjuna |
| Land area | 9.3 acres (3.8 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Botumidapalle |
| Taluk / tehsil | Obulavaripalle |
| District | Annamayya |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00593 |
In context
153 applications in Annamayya since January 2022 are in the same category (Mining): 128 approved, 11 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.3 acres, this one is larger than 53% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Botumidapalle, Obulavaripalle, Annamayya, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Beneficiation Unit of the capacity of throughput - 4,80,000TPA by M/s… — environmental approval granted, 3.9 km away
- Beneficiation Unit of the capacity of throughput - 4,80,000TPA by M/s… — cleared for impact study, 3.9 km away
- Expansion in Capacity of the Existing Barite Dry Beneficiation Plant… — environmental approval granted, 6.1 km away
- Expansion in Capacity of the Existing Barite Dry Beneficiation Plant… — cleared for impact study, 6.1 km away
- Mining project by M/s. Anjani Metals, Mg. Partner: Sri. Kavuluri Madhusudhana… — environmental approval granted, 6.1 km away
- Proposed to Change the Product-Mix by Increasing the Production of Ferro… — initial checks, 7.2 km away
- The Proposed Barites Mineral Wet Beneficiation Plant, with throughput capacity… — environmental approval granted, 7.9 km away
- Mining project by M/s. Lakshmi Narashima Mines & Minerals — environmental approval granted, 12.2 km away
More from Derangula Mallikarjuna in Annamayya
- Mining project by M/s Saritha Mines & Minerals — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.