Quick answers
What is this project?
Proposed Grinding Unit with capacity of 4.0 Million TPA by M/s. UltraTech Cement Limited is a proposed industrial project in Chinnipalem, Kothavalasa, Vizianagaram, Andhra Pradesh. The site covers 536.7 acres.
Who is building it?
The applicant is M/s. UltraTech Cement Ltd..
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 11 Dec 2023), as of 27 Nov 2026.
Where is it?
In Chinnipalem, Kothavalasa, Vizianagaram, Andhra Pradesh.
How big is it?
It has a stated cost of ₹685 crore and a site of 536.7 acres.
When was it filed?
The application was filed on 11 Dec 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Grinding Unit with capacity of 4.0 Million TPA by M/s. UltraTech Cement Limited
Project details
| Official title | Proposed Grinding Unit with capacity of 4.0 Million TPA at Kantakapalli Village, Kothavalasa Mandal, Vizianagaram District, Andhra Pradesh, by M/s. UltraTech Cement Limited |
|---|---|
| Status | Cleared for impact study |
| Status since | 11 Dec 2023 |
| Application filed | 11 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | M/s. UltraTech Cement Ltd. |
| Land area | 536.7 acres (217.2 ha) |
| Project cost | ₹685 crore |
| Village / locality | Chinnipalem |
| Taluk / tehsil | Kothavalasa |
| District | Vizianagaram |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00748 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 30 Mar 2024 | Environmental approval granted | 536.7 acres | ₹685 crore |
| Early planning filed 11 Dec 2023 (this page) | Cleared for impact study | 536.7 acres | ₹685 crore |
In context
40 applications in Vizianagaram since January 2022 are in the same category (Industry): 25 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 536.7 acres, this one is larger than 95% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chinnipalem, Kothavalasa, Vizianagaram, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Grinding Unit with capacity of 4.0 Million TPA by M/s. UltraTech… — environmental approval granted, 0 m away
- Proposed Expansion of Integrated Steel Plant by Addition of New Units - Sponge… — cleared for impact study, 2 km away
- Mining project by M/s. G.V.R Constructions (P) Ltd — cleared for impact study, 2 km away
- Sri R.V.V.Satyanarayana Raju — environmental approval granted, 2.2 km away
- Sri G. Sudarshana Rao — environmental approval granted, 2.2 km away
- Sri G. Sudarshana Rao — cleared for impact study, 2.2 km away
- Mining project by M/s. Mannava Mines and Minerals — environmental approval granted, 2.4 km away
- Mining project by M/s Shakthidar Nirmans, Mg.P: Sri R.V.V.Satyanarayana Raju, — environmental approval granted, 2.4 km away
All 182 UltraTech Cement projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.