Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 30 Nov 2023 |
| Application filed | 30 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Palakolanu Ksheera Sagarreddy |
| Land area | 19.5 acres (7.9 ha) |
| Project cost | ₹41 lakh |
| Village / locality | Kakavedu |
| Taluk / tehsil | Nagari |
| District | Chittoor |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00800 |
In context
364 applications in Chittoor since January 2022 are in the same category (Mining): 237 approved, 33 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 19.5 acres, this one is larger than 86% of them.
No other mining lease on record is within 500 m of this site; 24 have applied within 5 km.
Where it is
Kakavedu, Nagari, Chittoor, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s.Mukunda Mines. — environmental approval granted, 0 m away
- Mining of Road Metal & Building Stone Sri.P.Ksheera Sagara Reddy — cleared for impact study, 0 m away
- Mining project by M/s Mukunda Mines — environmental approval granted, 0 m away
- Bala Prasad Road Metal & Building Stone — environmental approval granted, 700 m away
- Mining project by M/s Sri Rama Stone Crusher — lapsed, 1.3 km away
- Mining project by M/s Govin Buildtech Pvt. Ltd. Mg. Dir: Sri Vijay Kumar Raju… — cleared for impact study, 1.5 km away
- Mining project by M/s Titan Infratech - 1.502 Ha — cleared for impact study, 1.6 km away
- Mining project by M/s Sri Muralikrishna Stone Crusher-11.577 Ha., — lapsed, 1.6 km away
More from Palakolanu Ksheera Sagarreddy in Chittoor
- Mining of Road Metal & Building Stone Sri.P.Ksheera Sagara Reddy — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.