Quick answers
What is this project?
Proposed Gangavaram Cement Grinding Unit with Production Capacity of 2 x 2 Million Metric Tons Per Annum (4 MMTPA)" is a proposed industrial project in Gajuvaka, Gajuwaka, Visakhapatnam, Andhra Pradesh. The site covers 39.6 acres.
Who is building it?
The applicant is Ambuja Cements Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 10 Jan 2025), as of 27 Nov 2026.
Where is it?
In Gajuvaka, Gajuwaka, Visakhapatnam, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1,000 crore and a site of 39.6 acres.
When was it filed?
The application was filed on 4 Mar 2024.
Project details
| Official title | Proposed Gangavaram Cement Grinding Unit with Production Capacity of 2 x 2 Million Metric Tons Per Annum (4 MMTPA)" located at Village: Pedagantyada, Taluk: Gajuwaka, District: Visakhapatnam , State: Andhra Pradesh by M/s Ambuja Cements Limited (ACL) |
|---|---|
| Status | Cleared for impact study |
| Status since | 10 Jan 2025 |
| Application filed | 4 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Ambuja Cements Limited |
| Land area | 39.6 acres (16 ha) |
| Project cost | ₹1,000 crore |
| Village / locality | Gajuvaka |
| Taluk / tehsil | Gajuwaka |
| District | Visakhapatnam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00830 |
In context
30 applications in Visakhapatnam since January 2022 are in the same category (Industry): 13 approved, 10 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 39.6 acres, this one is smaller than 59% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gajuvaka, Gajuwaka, Visakhapatnam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environmental Impact Assessment report for Amendment in EC & CRZ Clearance for… — environmental approval granted, 2.6 km away
- Port and coastal project by Adani Gangavaram Port Limited — initial checks, 2.9 km away
- Adani Gangavaram Port — returned to applicant, 3.1 km away
- Amendment in Ec and Crz Clearance for Change in Cargo Mix for Development of… — lapsed, 3.1 km away
- Master Plan for Adani Gangavaram Port Limited — cleared for impact study, 3.5 km away
- Mining project by Adani Gangavaram Port Limited — environmental approval granted, 3.8 km away
- Mining project by Adani Gangavaram Port Limited — environmental approval granted, 3.8 km away
- Mvv Gv Srinivasa Nilayam — environmental approval granted, 4.8 km away
All 87 Ambuja Cements projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.