What is Developing? Open the mapMap

Cleared for impact studyIndustry · East Godavari, Andhra Pradesh

Expansion of existing Single Super Phosphate (SSP) manufacturing unit in existing site by M/s. Subhodaya Chemicals Pvt. Ltd.

Expansion of existing Single Super Phosphate (SSP) manufacturing unit in existing site by M/s. Subhodaya Chemicals Pvt. Ltd is a proposed industrial project in Gauripatnam, Devarapalle, East Godavari, Andhra Pradesh. The site covers 26.1 acres. Its stated project cost is ₹27 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 14 Apr 2023).

See it on the live map All projects in East Godavari

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of existing Single Super Phosphate (SSP) manufacturing unit in existing site by M/s. Subhodaya Chemicals Pvt. Ltd is a proposed industrial project in Gauripatnam, Devarapalle, East Godavari, Andhra Pradesh. The site covers 26.1 acres.

Who is building it?

The applicant is Subhodaya Chemicals Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 14 Apr 2023), as of 27 Nov 2026.

Where is it?

In Gauripatnam, Devarapalle, East Godavari, Andhra Pradesh.

How big is it?

It has a stated cost of ₹27 crore and a site of 26.1 acres.

When was it filed?

The application was filed on 27 Mar 2023.

Project details

StatusCleared for impact study
Status since14 Apr 2023
Application filed27 Mar 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantSubhodaya Chemicals Private Limited
Land area26.1 acres (10.6 ha)
Project cost₹27 crore
Village / localityGauripatnam
Taluk / tehsilDevarapalle
DistrictEast Godavari
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-00900

In context

17 applications in East Godavari since January 2022 are in the same category (Industry): 8 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 26.1 acres, this one is smaller than 59% of them.

71 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gauripatnam, Devarapalle, East Godavari, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.