Quick answers
What is Smt V.Bhagya lakshmi?
Smt V.Bhagya lakshmi is an approved mining project in Palakuru, Banaganapalle, Nandyal, Andhra Pradesh. The site covers 2.8 acres.
Who is building it?
The applicant is Bhagya Lakshmi Vangala.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Mar 2023), as of 27 Nov 2026.
Where is it?
In Palakuru, Banaganapalle, Nandyal, Andhra Pradesh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 2.8 acres.
When was it filed?
The application was filed on 7 Mar 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Mar 2023 |
| Application filed | 7 Mar 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bhagya Lakshmi Vangala |
| Land area | 2.8 acres (1.1 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Palakuru |
| Taluk / tehsil | Banaganapalle |
| District | Nandyal |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00938 |
In context
135 applications in Nandyal since January 2022 are in the same category (Mining): 80 approved, 16 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.8 acres, this one is smaller than 87% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 20.7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 34 mining leases have applied within 5 km.
Where it is
Palakuru, Banaganapalle, Nandyal, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Smt A. Madhavi Latha, for mining of Lime Stone Slabs (Black) Over an extent of… — lapsed, 350 m away
- Limestone Slabs ( Black ) over an extent of 1.809 Ha — lapsed, 350 m away
- Mining of Limestone Slabs (Black) by Smt. A. Madhavi Latha — lapsed, 350 m away
- Limestone Slabs (Black) of in Production from 84210 TPA @60% recovery to… — lapsed, 350 m away
- Sri Apathi Madhusudhana Chowdary (1.518 Ha) — not approved, 850 m away
- 1.250 Ha Lime Kankar and Limestone Slabs (Black) mining of M/s Pudhota… — environmental approval granted, 1.2 km away
- Smt S. Sneha, Mining of Lime Stone Slabs (Black) over an extent of 1.093 Ha — environmental approval granted, 1.2 km away
- Mining of Lime Stone Slabs (Black), Smt. S.Sneha ( 1.093 Ha) — cleared for impact study, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.