| Status | Environmental approval granted |
|---|---|
| Status since | 24 Jan 2023 |
| Application filed | 24 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | M/S. Src Infra Developers PVT. LTD. |
| Land area | 9.9 acres (4 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Chamaluru |
| Taluk / tehsil | Narpala |
| District | Anantpur |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00964 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Dec 2024 | Withdrawn | 11.1 acres | ₹50 lakh |
| New project filed 24 Jan 2023 (this page) | Environmental approval granted | 9.9 acres | ₹40 lakh |
In context
223 applications in Anantpur since January 2022 are in the same category (Mining): 158 approved, 23 filed or under review, and 42 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.9 acres, this one is larger than 55% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 32.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 2 mining leases have applied within 5 km.
Where it is
Chamaluru, Narpala, Anantpur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s SRC Infra Developers Pvt,Ltd., Mg.Dir: Sri Muttineni… — environmental approval granted, 450 m away
- Mining project by M/s SRC Infra Developers Pvt, Ltd. — withdrawn, 450 m away
- M/s. SRC Infra Developers Pvt. Ltd. - 4.900 ha (Gravel Mine) — under environmental review, 6.2 km away
- De-casting of sand in Patta Land of Sri. M. Sudhakar — initial checks, 9.3 km away
- Sri B. Chinna Venkata Ramudu — under environmental review, 9.4 km away
- Singanamala PSP (800 MW)-Request for Issue of Permission for Geo-Technical… — lapsed, 11.5 km away
- Laying of Underground Optical Fibre Cable (OFC) from Anantapur to Tadipatri… — lapsed, 11.8 km away
- Singanamala Pumped Storage Project, Anantapuram district of Andhra Pradesh. — lapsed, 11.9 km away
More from M/S. Src Infra Developers PVT. LTD. in Anantpur
- M/s. SRC Infra Developers Pvt. Ltd, Director: Sri. D. Venkatesulu, Temporary… — environmental approval granted
- M/s. SRC Infra Developers Pvt. Ltd. - 4.900 ha (Gravel Mine) — under environmental review
- Mining project by M/s. SRC Infra Developers Pvt. Ltd. — environmental approval granted
7 Src Infra Developers projects in Anantpur
All 8 Src Infra Developers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.