One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s. Dastagiri Swamy Granites
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Sept 2023 |
| Application filed | 27 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dastagiri Swamy Granites |
| Land area | 4.6 acres (1.9 ha) |
| Project cost | ₹1 crore |
| Village / locality | Sankhavaram |
| Taluk / tehsil | Kanigiri |
| District | Prakasam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01043 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 10 Feb 2025 | Environmental approval granted | 4.6 acres | ₹1 crore |
| New project filed 27 Sept 2023 (this page) | Environmental approval granted | 4.6 acres | ₹1 crore |
In context
210 applications in Prakasam since January 2022 are in the same category (Mining): 153 approved, 17 filed or under review, and 40 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.6 acres, this one is smaller than 78% of them.
No other mining lease on record is within 500 m of this site; 14 have applied within 5 km.
Where it is
Sankhavaram, Kanigiri, Prakasam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Dastagiri Swamy Granites — environmental approval granted, 0 m away
- Smt. Y. Anjanadevi — environmental approval granted, 850 m away
- Smt. Y. Anjanadevi — cleared for impact study, 850 m away
- Smt. Y. Anjanadevi — environmental approval granted, 1.3 km away
- Smt. Y. Anjanadevi — cleared for impact study, 1.3 km away
- 3.112 Hect. of Black Granite Quarry of M/s Sri Gayatri Granites,… — environmental approval granted, 1.3 km away
- 3.112 Hect. of Black Granite Quarry of M/s Sri Gayatri Granites,… — cleared for impact study, 1.3 km away
- Mining project by M/s Sri Lakshmi Srinivasa Granites — environmental approval granted, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.