One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s. Radha Krishna Minerals – 6.47Acres/2.618 Ha
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 Sept 2023 |
| Application filed | 22 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Radha Krishna Minerals |
| Land area | 6.5 acres (2.6 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Papayapalem |
| Taluk / tehsil | Machavaram |
| District | Palnadu |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01044 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 23 Oct 2025 | Environmental approval granted | 6.5 acres | ₹25 lakh |
| Early planning filed 22 Sept 2023 (this page) | Cleared for impact study | 6.5 acres | ₹25 lakh |
In context
178 applications in Palnadu since January 2022 are in the same category (Mining): 124 approved, 15 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.5 acres, this one is larger than 51% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Papayapalem, Machavaram, Palnadu, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Radha Krishna Minerals – 6.47Acres/2.618 Ha — environmental approval granted, 0 m away
- 23.425ha Road metal and gravel quarry of Sri M. Nityananda Sarma — lapsed, 6.7 km away
- 4.938 ha Road metal & Gravel M/s. Dasaradharam Mining & Reality LLP — environmental approval granted, 6.7 km away
- Mining project by M/s. VVD Constructions Private Limited — lapsed, 6.9 km away
- Road Metal & Gravel Mine over an extent of 23.425 Ha — lapsed, 6.9 km away
- 23.425 Hectares of Road Metal & Gravel Quarry of Sri M. Nityananda Sarma, Sy.… — cleared for impact study, 6.9 km away
- Grain Based Distillery project Capacity of 200 KLPD Fuel Ethanol — environmental approval granted, 7.2 km away
- Grain Based Distillery project Capacity of 200 KLPD Fuel Ethanol — not approved, 7.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.