Quick answers
What is Mining project by M/s. My Roof Constructions?
This approved mining project by M/s. My Roof Constructions is in Chilakapadu, Marripadu, Nellore, Andhra Pradesh. The site covers 11.4 acres.
Who is building it?
The applicant is My Roof Constructions.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Apr 2023), as of 27 Nov 2026.
Where is it?
In Chilakapadu, Marripadu, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹48 lakh and a site of 11.4 acres.
When was it filed?
The application was filed on 25 Apr 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Apr 2023 |
| Application filed | 25 Apr 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | My Roof Constructions |
| Land area | 11.4 acres (4.6 ha) |
| Project cost | ₹48 lakh |
| Village / locality | Chilakapadu |
| Taluk / tehsil | Marripadu |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01088 |
In context
232 applications in Nellore since January 2022 are in the same category (Mining): 150 approved, 25 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.4 acres, this one is smaller than 61% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Chilakapadu, Marripadu, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 1.084 Hectares of Quartz Mine of M/s. S. Kota Reddy & Co., In Sy. No. 162/1 &… — environmental approval granted, 7.7 km away
- Laying of Under Ground Optical Fiber Cable (OFC) between Udayagiri-Duttalur — lapsed, 8.4 km away
- Preliminary Exploration for Copper and Associated Minerals in Rachavaripalle… — initial checks, 9.2 km away
- Diversion of 2.09 Ha in Nellore Division for formation of BT road from Km.3/2… — lapsed, 9.7 km away
- Laying underground OFC along the road between "Mydukur – Onipenta –… — lapsed, 10.6 km away
- M/s. Indosol Solar Private Limited - Quartz mine - 32.777 ha — environmental approval granted, 13.8 km away
- M/s. Indosol Solar Private Limited - Quartz mine - 32.777 ha — cleared for impact study, 13.8 km away
- Quarry Lease Area Over an Extent of 3.988 Hects of Veerabhadra Mines and… — environmental approval granted, 15.5 km away
All 3 My Roof Constructions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.