Quick answers
What is Sri Lakshmi Venkateswara Metal Crushing Unit?
Sri Lakshmi Venkateswara Metal Crushing Unit is an approved mining project in Demakethepalle, Chilamathur, Sri Sathya Sai, Andhra Pradesh. The site covers 4 acres.
Who is building it?
The applicant is Vaddera Venkatesh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Dec 2024), as of 27 Nov 2026.
Where is it?
In Demakethepalle, Chilamathur, Sri Sathya Sai, Andhra Pradesh.
How big is it?
It has a stated cost of ₹25 lakh and a site of 4 acres.
When was it filed?
The application was filed on 8 Jan 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Dec 2024 |
| Application filed | 8 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vaddera Venkatesh |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Demakethepalle |
| Taluk / tehsil | Chilamathur |
| District | Sri Sathya Sai |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01162 |
In context
123 applications in Sri Sathya Sai since January 2022 are in the same category (Mining): 88 approved, 7 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4 acres, this one is smaller than 93% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 8.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Demakethepalle, Chilamathur, Sri Sathya Sai, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri V. Venkatesh — lapsed, 200 m away
- Sri G. Ramesh — cleared for impact study, 2.1 km away
- 4.950 Ha. of Road Metal and Building Stone Quarry,M/s Thirumala… — environmental approval granted, 4.3 km away
- Sri K. Dhanunjaya — environmental approval granted, 6.6 km away
- Mining of Gravel quarry, Sri G. Srinivasulu — environmental approval granted, 13.5 km away
- Mining project by M/s Oximos Fine Sands LLP — lapsed, 13.5 km away
- M/s Oximos Fine Sands LLP, Part: Smt.Darla Srilakshmi, Road Metal & Building… — not approved, 13.5 km away
- Diversion of 2.41 ha of Forest Land in Sri Satya Sai Forest Division for… — in-principle approval, conditions pending, 13.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.