Project details
| Status | Lapsed |
|---|---|
| Status since | 1 Jan 2025 |
| Application filed | 12 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Neelakandan V |
| Land area | 12.1 acres (4.9 ha) |
| Project cost | ₹38 lakh |
| Village / locality | Eachaneri |
| Taluk / tehsil | Thavanampalle |
| District | Chittoor |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01185 |
In context
364 applications in Chittoor since January 2022 are in the same category (Mining): 237 approved, 33 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.1 acres, this one is larger than 69% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Eachaneri, Thavanampalle, Chittoor, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of Black Granite, SRI. V.BHASKAR NAIDU — more information requested, 1.1 km away
- Mining of Black Granite, SRI. V.BHASKAR NAIDU — cleared for impact study, 1.1 km away
- SRI. V.BHASKAR NAIDU mining of Black Granite — not approved, 1.1 km away
- Uthara Brahmanapalli Sand Reach in (Bahuda River) — environmental approval granted, 7.7 km away
- Smt K.M. Althaf Kouser — initial checks, 9.1 km away
- Mining project by M/s. Tam Granites and Marbles Pvt. Limited — under environmental review, 9.8 km away
- Mining project by M/s. Tam Granites and Marbles Pvt. Limited — cleared for impact study, 9.8 km away
- Sri Guhan Transports — environmental approval granted, 10.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.