Sri Turram Rama Krishna Dora is a proposed mining project in Pothandorapalem, Gangavaram, Alluri Sitharama Raju, Andhra Pradesh. The site covers 7.5 acres.
Who is building it?
The applicant is Turram Dora.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 4 Jul 2024), as of 27 Nov 2026.
Where is it?
In Pothandorapalem, Gangavaram, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 7.5 acres.
When was it filed?
The application was filed on 13 Jan 2024.
One of 4 filings for this project. The project's main page, with every filing and where each stands: Sri Turram Rama Krishna Dora
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 4 Jul 2024 |
| Application filed | 13 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Turram Dora |
| Land area | 7.5 acres (3 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Pothandorapalem |
| Taluk / tehsil | Gangavaram |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01195 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Dec 2024 | Environmental approval granted | 7.5 acres | ₹35 lakh |
| New project filed 4 Dec 2024 | Environmental approval granted | 3.7 acres | ₹25 lakh |
| Early planning filed 13 Jan 2024 (this page) | Cleared for impact study | 7.5 acres | ₹35 lakh |
| Early planning filed 13 Jan 2024 | Cleared for impact study | 3.7 acres | ₹25 lakh |
In context
44 applications in Alluri Sitharama Raju since January 2022 are in the same category (Mining): 35 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.5 acres, this one is smaller than 73% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Pothandorapalem, Gangavaram, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri Turram Rama Krishna Dora — environmental approval granted, 0 m away
- Sri Turram Rama krishna Dora — environmental approval granted, 400 m away
- Sri Turram Rama krishna Dora — cleared for impact study, 400 m away
- Proposed Road Metal & Ballast, Rough Stone, Boulders & Ordinary Earth Mining… — environmental approval granted, 4.7 km away
- Sri Peeta Rajasekhar — under environmental review, 4.8 km away
- Sri Peeta Rajasekhar — lapsed, 4.8 km away
- Proposed Road Metal & Ballast, Rough Stone, Boulders & Ordinary Earth Mining… — environmental approval granted, 4.8 km away
- General exploration for graphite in Chinnagalikonda block, Alluri Sitharama… — lapsed, 10.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.