Quick answers
What is this project?
Proposed Mill Expansion Plan (MEP) with Installation of 1,75,000 tpa Paper Board Machine, 1,60,000 tpa Writing & Printing Paper machine, 1,92,500 tpa New Chemical Wood Pulp mill and 87,500 BD tpa BCTMP connected is a lapsed industrial project in Jegurupadu, Kadiam, East Godavari, Andhra Pradesh. The site covers 233.7 acres.
Who is building it?
The applicant is Andhra Paper Limited.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Jegurupadu, Kadiam, East Godavari, Andhra Pradesh.
How big is it?
It has a stated cost of ₹3,670.6 crore and a site of 233.7 acres.
When was it filed?
The application was filed on 23 Apr 2024.
Project details
| Official title | Proposed Mill Expansion Plan (MEP) with Installation of 1,75,000 tpa Paper Board Machine, 1,60,000 tpa Writing & Printing Paper machine, 1,92,500 tpa New Chemical Wood Pulp mill and 87,500 BD tpa BCTMP connected along with Recovery Plant(1500 TPD of BLS) and Expansion of Co-generation Power Plant from 5.74 MW to 94 MW with New Coal fired Boiler and New TGs and auxiliary facilities in the Existing Paper Mill at Andhra Paper Limited (APL) Unit: Kadiyam, Madhavarayudu Palem, Kadiyam Mandal, East |
|---|---|
| Status | Lapsed |
| Status since | 29 Oct 2024 |
| Application filed | 23 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Andhra Paper Limited |
| Land area | 233.7 acres (94.6 ha) |
| Project cost | ₹3,670.6 crore |
| Village / locality | Jegurupadu |
| Taluk / tehsil | Kadiam |
| District | East Godavari |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01598 |
In context
17 applications in East Godavari since January 2022 are in the same category (Industry): 8 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 233.7 acres, this one is larger than 76% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jegurupadu, Kadiam, East Godavari, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 700 TPD (2,40,000 TPA) Board machine, installation of 450 TPD (1,53,000TPA)… — withdrawn, 200 m away
- Mining project by M/s G.V.V.S.R Earth Movers, Mg.P: Sri Garapati Veera Venkata… — environmental approval granted, 550 m away
- Mining project by M/S AMBICA MINERAL, Mg. P: P. SRINIVASA RAJU — environmental approval granted, 550 m away
- Mining project by M/s Sangam Minerals — environmental approval granted, 1.3 km away
- Mining project by M/s Sangam Minerals — not approved, 1.3 km away
- Mining project by M/s Sangam Minerals — environmental approval granted, 1.3 km away
- Sri Konda Babji — environmental approval granted, 3.4 km away
- Sri S. Seetha Rama Raju — under environmental review, 3.7 km away
More from Andhra Paper Limited in East Godavari
- 35,000 TPA Tissue Paper Machine Within the Existing Facility of M/s. ANDHRA… — initial checks
- 700 TPD (2,40,000 TPA) Board machine, installation of 450 TPD (1,53,000TPA)… — withdrawn
All 3 Andhra Paper projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.