Quick answers
What is this project?
This approved mining project by M/s. Guru Raghavendra Infrastructures – 2.999 Ha/ 7.41 Acres is in Annavaram, Jaladanki, Nellore, Andhra Pradesh. The site covers 7.4 acres.
Who is building it?
The applicant is Guru Raghavendra Infrastructures.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 12 Apr 2025), as of 27 Nov 2026.
Where is it?
In Annavaram, Jaladanki, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹40 lakh and a site of 7.4 acres.
When was it filed?
The application was filed on 8 Jul 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Apr 2025 |
| Application filed | 8 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Guru Raghavendra Infrastructures |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Annavaram |
| Taluk / tehsil | Jaladanki |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01620 |
In context
232 applications in Nellore since January 2022 are in the same category (Mining): 150 approved, 25 filed or under review, and 57 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.4 acres, this one is smaller than 79% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Annavaram, Jaladanki, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri N. P. Prasanna Reddy — environmental approval granted, 10.9 km away
- Diversion of Forest Land for the Formation of an Approach Road to Agricultural… — under forest review, 11.1 km away
- Sri Mettukuru Ramjeevi Reddy — under environmental review, 14.3 km away
- Transfer of Environmental Clearance issued for quarry lease at Gowravaram (V),… — environmental approval granted, 16.5 km away
- Critical Mineral Assessment Programme for assessing the potentiality of… — initial checks, 17.1 km away
- 2D seismic data acquisition in Sector-3B (Krishna Godavari), under Mission… — lapsed, 18.2 km away
- 2D seismic data acquisition in Sector-3B (Krishna Godavari), under Mission… — forest land use approved, 18.2 km away
- Road from MC road to Peparlavaripalem (via) Lakshmipuram — lapsed, 20.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.