Quick answers
What is this project?
Sri Venkateswara Infra, Quartz mine , 4.90 Ha, Sy. No. 370/P, Obulapuram (V), Bathalapalli (M), Sri Satya Sai District, A.P is an approved mining project in Obulapuram, Bathalapalle, Sri Sathya Sai, Andhra Pradesh. The site covers 12.1 acres.
Who is building it?
The applicant is Kothapalli Pandu Ranga Reddy.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Jul 2024), as of 27 Nov 2026.
Where is it?
In Obulapuram, Bathalapalle, Sri Sathya Sai, Andhra Pradesh.
How big is it?
It has a stated cost of ₹50 lakh and a site of 12.1 acres.
When was it filed?
The application was filed on 29 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Jul 2024 |
| Application filed | 29 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kothapalli Pandu Ranga Reddy |
| Land area | 12.1 acres (4.9 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Obulapuram |
| Taluk / tehsil | Bathalapalle |
| District | Sri Sathya Sai |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01627 |
In context
123 applications in Sri Sathya Sai since January 2022 are in the same category (Mining): 88 approved, 7 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.1 acres, this one is larger than 71% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Obulapuram, Bathalapalle, Sri Sathya Sai, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s SRI RAMESHWARA ASSOCIATES — environmental approval granted, 8.5 km away
- De-casting of sand in Patta land of Sri. B. Adinarayana Reddy — environmental approval granted, 10.8 km away
- Chitravathi Pumped Storage Hydro-Electric Project Sri Sathya Sai District of… — environmental approval granted, 15.9 km away
- Road Metal, Building Stone, Gravel and M-Sand over an extent of 4.5 Ha — not approved, 20.8 km away
- Mining project by M/s LN ENTERPRISES — environmental approval granted, 22 km away
- Mining project by M/s L N ENTERPRISES — environmental approval granted, 22 km away
- Sri. C. Narasimha Murthy — environmental approval granted, 23.8 km away
- Sri. K. Srinivasa Rao — environmental approval granted, 23.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.