One of 2 filings for this project. The project's main page, with every filing and where each stands: Modernisation-cum-expansion of existing Production of Pig Iron / Hot Metal from 0.25 to…
Project details
| Official title | Modernisation-cum-expansion of existing Production of Pig Iron / Hot Metal from 0.25 to 0.45 MTPA, DI Pipe from 0.19 to 0.45 MTPA, DI Pipe Fitting 30,000 TPA, Sinter from 0.2988 to 0.55 MTPA & CPP from 26.43 to 60 MW by installation of a new CPP of 30MW capacity at Village - Haresamudram, Mandal - Bommanahal, District Ananthapur, Andhra Pradesh |
|---|---|
| Status | Cleared for impact study |
| Status since | 2 Aug 2024 |
| Application filed | 15 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Jindal Saw Limited |
| Land area | 345.7 acres (139.9 ha) |
| Project cost | ₹2,210.4 crore |
| Village / locality | Hare Samudram |
| Taluk / tehsil | Bommanahal |
| District | Anantpur |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01640 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 6 May 2025 | Environmental approval granted | 345.7 acres | ₹2,210.4 crore |
| Early planning filed 15 Jun 2024 (this page) | Cleared for impact study | 345.7 acres | ₹2,210.4 crore |
In context
18 applications in Anantpur since January 2022 are in the same category (Industry): 11 approved, 3 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 345.7 acres, this one is larger than 67% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hare Samudram, Bommanahal, Anantpur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion & Modification of Plant Capacity of Jindal Saw LTD From 4.5… — initial checks, 0 m away
- Modernisation-cum-expansion of existing Production of Pig Iron / Hot Metal… — environmental approval granted, 0 m away
- Expansion of Existing pig iron plant (2,50,000 TPA) and Ductile Iron Pipe… — environmental approval granted, 0 m away
- Road Metal and Building Stone Quarry Over an Extent of 1.0 Ha — environmental approval granted, 5.3 km away
- Road metal & Building Stone Quarry over an extent of 6.08 Ha — environmental approval granted, 5.3 km away
- Mining project by M/s.Aishwarya Stone Crushers-6.00 Ha — lapsed, 5.6 km away
- G Mohan Das — environmental approval granted, 5.8 km away
- Road Metal & Building Stone - 2.082 Ha of M. Guru Prasad — environmental approval granted, 6.1 km away
More from Jindal Saw Limited in Anantpur
- Expansion of Existing pig iron plant (2,50,000 TPA) and Ductile Iron Pipe… — environmental approval granted
3 Jindal Saw projects in Anantpur
All 12 Jindal Saw projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.