Quick answers
What is Mining project by M/s SRI DURGA STONE CRUSHERS-2.970 Ha?
This approved mining project by M/s SRI DURGA STONE CRUSHERS-2.970 Ha is in Tirumalakuppam, Puttur, Tirupati, Andhra Pradesh. The site covers 7.3 acres.
Who is building it?
The applicant is Sri Durga Stone Crushers.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Feb 2025), as of 27 Nov 2026.
Where is it?
In Tirumalakuppam, Puttur, Tirupati, Andhra Pradesh.
How big is it?
It has a stated cost of ₹20 lakh and a site of 7.3 acres.
When was it filed?
The application was filed on 16 May 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Feb 2025 |
| Application filed | 16 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sri Durga Stone Crushers |
| Land area | 7.3 acres (3 ha) |
| Project cost | ₹20 lakh |
| Village / locality | Tirumalakuppam |
| Taluk / tehsil | Puttur |
| District | Tirupati |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01675 |
In context
178 applications in Tirupati since January 2022 are in the same category (Mining): 112 approved, 11 filed or under review, and 55 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.3 acres, this one is smaller than 70% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 12.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 12 mining leases have applied within 5 km.
Where it is
Tirumalakuppam, Puttur, Tirupati, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Sri Durga Stone Crushers, 1.956 Ha — lapsed, 150 m away
- Mining project by M/s. Mukunda Mines — cleared for impact study, 1.9 km away
- Sri.P. Ksheera Sagara Reddy, Mining of Road Metal, Building Stone and Gravel… — lapsed, 1.9 km away
- Educational Buildings (College & Hostel) by M/s. Anna Gowri Educational Trust — environmental approval granted, 2 km away
- Mining project by M/s Chaitanya Granites — cleared for impact study, 3.9 km away
- Smt. Boddapati Santhi Sree — more information requested, 3.9 km away
- Satrawada (Adavikothuru) Village Road Metal & Building Stone and Gravel Lease — environmental approval granted, 4.2 km away
- Satrawada (Adavikothuru) Village Road Metal & Building Stone and Gravel Lease — not approved, 4.2 km away
More from Sri Durga Stone Crushers in Tirupati
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.