One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s. Sri Lakshmi Narasimha Minerals
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Dec 2024 |
| Application filed | 14 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Yarava Sreenivasulu |
| Land area | 12.4 acres (5 ha) |
| Project cost | ₹61 lakh |
| Village / locality | Haripuram |
| Taluk / tehsil | Rambilli |
| District | Anakapalli |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01715 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 27 Dec 2024 | Environmental approval granted | 12.4 acres | ₹80 lakh |
| New project filed 14 Jun 2024 (this page) | Environmental approval granted | 12.4 acres | ₹61 lakh |
In context
213 applications in Anakapalli since January 2022 are in the same category (Mining): 151 approved, 18 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.4 acres, this one is larger than 73% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Haripuram, Rambilli, Anakapalli, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Sri Lakshmi Narasimha Minerals — environmental approval granted, 300 m away
- Sri Vijay Kumar Naidu Dasamnani — environmental approval granted, 650 m away
- Sri Srinivasa Rao Gunipudi — environmental approval granted, 1.2 km away
- Residential Apartment Buildings (Honeyy Sreenivasam-9) consisting Nine (09)… — environmental approval granted, 3.5 km away
- Industrial project by Alpro Polymer Private Limited — more information requested, 4.9 km away
- Request for Corrigendum to the Amended EC for addition of Disposal Option of… — environmental approval granted, 6 km away
- Proposed Ductile Iron Spun Pipe (including melting of pig iron) Manufacturing… — withdrawn, 6.1 km away
- Proposed Ductile Iron Spun Pipe (Including melting of pig iron) Manufacturing… — not approved, 6.1 km away
More from Yarava Sreenivasulu in Anakapalli
- Sri Yarava Srinivas — under environmental review
- Mining project by M/s. Sri Lakshmi Narasimha Minerals — environmental approval granted
- Mining project by M/s. Sri Lakshmi Narasimha Minerals — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.