One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Onshore Oil and Gas Development, Production and Processing Facilities with…
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 25 Mar 2025 |
| Application filed | 6 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Imc Infrastructure Private Limited |
| Land area | 472 acres (191 ha) |
| Project cost | ₹400 crore |
| Village / locality | Bobbanapalle |
| Taluk / tehsil | Veeravasaram |
| District | West Godavari |
| State | Andhra Pradesh |
| Location from | Site area on record |
| Our reference | WID-AP-01762 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Aug 2025 | Environmental approval granted | 35,388.1 acres | ₹400 crore |
| New project filed 6 Oct 2024 (this page) | Returned to applicant | 472 acres | ₹400 crore |
In context
8 applications in West Godavari since January 2022 are in the same category (Mining): 6 approved, 1 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 43 days from filing to approval.
No other mining lease on record has applied within 5 km of this site.
Where it is
Bobbanapalle, Veeravasaram, West Godavari, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Onshore Oil and Gas Development, Production and Processing Facilities… — environmental approval granted, 10.8 km away
- Proposed Onshore Oil and Gas Development, Production and Processing Facilities… — cleared for impact study, 10.8 km away
- Proposed New Residential High rise Building Project "ARK THE PRIDE" — withdrawn, 15 km away
- Proposed New Residential High rise Building Project "ARK THE PRIDE" — lapsed, 15.1 km away
- Proposed New Residential High rise Building Project "ARK THE PRIDE" — environmental approval granted, 15.1 km away
- Anti Erosion Embankment — cleared for impact study, 17.4 km away
- Anti Erosion Embankment — lapsed, 17.4 km away
- Proposed Palem Suites Beach Resort at Survey No. 447/5, 448/1, 228/2A,… — under coastal review, 17.4 km away
More from Imc Infrastructure Private Limited in West Godavari
- Proposed Onshore Oil and Gas Development, Production and Processing Facilities… — cleared for impact study
All 3 Imc Infrastructure projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.