What is Developing? Open the mapMap

Cleared for impact studyBuildings & townships · Guntur, Andhra Pradesh

Residential project by Sri Valli Pravas M/s. Undavalli Constructions Private Limited

This proposed residential project by Sri Valli Pravas M/s. Undavalli Constructions Private Limited is in Kazza, Mangalagiri, Guntur, Andhra Pradesh. It plans 668 units in 8 towers on 8.6 acres. Its stated project cost is ₹140 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 17 Jan 2025).

See it on the live map All projects in Guntur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

This proposed residential project by Sri Valli Pravas M/s. Undavalli Constructions Private Limited is in Kazza, Mangalagiri, Guntur, Andhra Pradesh. It plans 668 units in 8 towers on 8.6 acres.

Who is building it?

The applicant is Undavalli Constructions Private Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 17 Jan 2025), as of 27 Nov 2026.

Where is it?

In Kazza, Mangalagiri, Guntur, Andhra Pradesh.

How big is it?

It has a stated cost of ₹140 crore and a site of 8.6 acres.

When was it filed?

The application was filed on 20 Aug 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Building project by Sri Valli Pravas M/s. Undavalli Constructions Private Limited

Project details

StatusCleared for impact study
Status since17 Jan 2025
Application filed20 Aug 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorBuildings & townships
ApplicantUndavalli Constructions Private Limited
UseResidential
Units668
Towers8
Land area8.6 acres (3.5 ha)
Built-up area1,45,602 m² (15,67,245 sq ft)
Plot area34,802 m² (3,74,605 sq ft)
Project cost₹140 crore
Village / localityKazza
Taluk / tehsilMangalagiri
DistrictGuntur
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-01799

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 16 Jul 2025Environmental approval granted8.6 acres₹140 crore
Early planning filed 20 Aug 2024 (this page)Cleared for impact study8.6 acres₹140 crore

In context

57 applications in Guntur since January 2022 are in the same category (Buildings & townships): 39 approved, 10 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 40 days from filing to approval. At 8.6 acres, this one is larger than 58% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kazza, Mangalagiri, Guntur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.