Quick answers
What is this project?
Proposed HPCL's CBG Plant and 3 KLPD Ethanol Production at Denduluru, Eluru District, Andhra Pradesh is a lapsed industrial project in Muppavaram, Denduluru, Eluru, Andhra Pradesh. The site covers 55 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
No. The application was lapsed on 7 Apr 2025, so it is no longer under consideration.
Where is it?
In Muppavaram, Denduluru, Eluru, Andhra Pradesh.
How big is it?
It has a stated cost of ₹342.8 crore and a site of 55 acres.
When was it filed?
The application was filed on 10 Jun 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 7 Apr 2025 |
| Application filed | 10 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 55 acres (22.3 ha) |
| Project cost | ₹342.8 crore |
| Village / locality | Muppavaram |
| Taluk / tehsil | Denduluru |
| District | Eluru |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01806 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 10 Jun 2024 (this page) | Lapsed | 55 acres | ₹342.8 crore |
| Early planning filed 7 May 2024 | Lapsed | 55 acres | ₹342.8 crore |
Where it is
Muppavaram, Denduluru, Eluru, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed HPCL's CBG Plant and 3 KLPD Ethanol Production at Denduluru, Eluru… — lapsed, 0 m away
- ASRAM Super Specialty Hospital and ASR Institute for Cancer Care, Research and… — environmental approval granted, 11.9 km away
- Amendment in Terms of Reference by M/s Alluri Sitarama Raju Educational… — cleared for impact study, 11.9 km away
- Expansion of Cancer Hospital and Medicine Allied Block by M/s Alluri Sitarama… — cleared for impact study, 11.9 km away
- Smt.V. Radhika — environmental approval granted, 14.5 km away
- Smt.V. Radhika — cleared for impact study, 14.5 km away
- Smt. Hemalatha Devineni — environmental approval granted, 15.2 km away
- Smt. Hemalatha Devineni — cleared for impact study, 15.2 km away
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.