Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Feb 2025 |
| Application filed | 28 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Marthala Muni Reddy |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Gollapalle |
| Taluk / tehsil | Mylavaram |
| District | Y.S.R. |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02026 |
In context
139 applications in Y.S.R. since January 2022 are in the same category (Mining): 106 approved, 8 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.9 acres, this one is smaller than 89% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Gollapalle, Mylavaram, Y.S.R., Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 5.0 Million TPA Integrated Cement Clinkerisation Plant, 8.0 Million… — lapsed, 3.1 km away
- Proposed Kadapa Limestone Mine (ML Area: 997.08 ha) with Proposed Limestone… — lapsed, 3.4 km away
- Madhavapuram Limestone Mining Lease Block over an area of 691.096 ha as per… — cleared for impact study, 6.6 km away
- Expansion of "Nawabpeta-Talamanchipatnam Limestone Mine" (ML Area-407.05 Ha)… — cleared for impact study, 7.4 km away
- Expansion of "Nawabpeta-Talamanchipatnam Limestone Mine" (ML Area-407.05 Ha)… — lapsed, 7.6 km away
- Expansion of Existing Integrated Cement Plant of Dalmia Cement (Bharat) LTD.… — environmental approval granted, 8.7 km away
- Expansion of Existing Integrated Cement Plant of Dalmia Cement (Bharat) LTD.… — returned to applicant, 8.7 km away
- Expansion of Existing Integrated Cement Plant of Dalmia Cement (Bharat) LTD.… — cleared for impact study, 8.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.