Quick answers
What is this project?
This approved mining project by M/s Sri Venkateswara Granites & Metals, Mg.P: Sri Goli Rami Reddy (1.878 Hects.,) is in Pragadavaram, Chintalapudi, Eluru, Andhra Pradesh. The site covers 4.6 acres.
Who is building it?
The applicant is Sri Venkateswara Granites & Metals.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Dec 2025), as of 27 Nov 2026.
Where is it?
In Pragadavaram, Chintalapudi, Eluru, Andhra Pradesh.
How big is it?
It has a stated cost of ₹30 lakh and a site of 4.6 acres.
When was it filed?
The application was filed on 6 Nov 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Dec 2025 |
| Application filed | 6 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sri Venkateswara Granites & Metals |
| Land area | 4.6 acres (1.9 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Pragadavaram |
| Taluk / tehsil | Chintalapudi |
| District | Eluru |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02220 |
In context
64 applications in Eluru since January 2022 are in the same category (Mining): 42 approved, 9 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.6 acres, this one is smaller than 73% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 9.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Pragadavaram, Chintalapudi, Eluru, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri Balaji Granites and Metals, Mg.P.Sri Goli Manmadha Reddy — environmental approval granted, 150 m away
- Transfer of Environmental Clearance from M/s. Porus Laboratories Private… — lapsed, 17.8 km away
- Sri Amudala Pitchaiah Alias Issac (0.741 Hect) — environmental approval granted, 19.4 km away
- Sri Amudala Pitchaiah Alias Issac (0.741 Ha) — not approved, 19.4 km away
- Sri Amudala Pitchaiah Alias Issac — withdrawn, 19.4 km away
- Smt.V. Radhika — environmental approval granted, 26.7 km away
- Smt.V. Radhika — cleared for impact study, 26.7 km away
- 4.383 Ha., Ball Clay Mine at Sy.No. 18/2 (P) and 66 (P), Dwaraka Tirumala… — under environmental review, 27.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.