Quick answers
What is this project?
Proposed Road Metal, Morrum/Gravel, Ordinary Earth & Ballast Mining Project of M/s Lakshmi Ganapathi Civil Constructions is a lapsed mining project in Gangavaram, Rowthulapudi, Kakinada, Andhra Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Lakshmi Ganapathi Civil Constructions.
Has it been approved?
No. The application was lapsed on 19 May 2026, so it is no longer under consideration.
Where is it?
In Gangavaram, Rowthulapudi, Kakinada, Andhra Pradesh.
How big is it?
It has a stated cost of ₹30 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 3 Dec 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 19 May 2026 |
| Application filed | 3 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Lakshmi Ganapathi Civil Constructions |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Gangavaram |
| Taluk / tehsil | Rowthulapudi |
| District | Kakinada |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02237 |
In context
94 applications in Kakinada since January 2022 are in the same category (Mining): 64 approved, 11 filed or under review, and 19 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.9 acres, this one is smaller than 74% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 37.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 31 mining leases have applied within 5 km.
Where it is
Gangavaram, Rowthulapudi, Kakinada, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s Lakshmi Ganapathi Civil Constructions — lapsed, 0 m away
- Proposed Road Metal, Morrum/Gravel, Ordinary Earth & Ballast Mining Project of… — environmental approval granted, 100 m away
- Proposed Road Metal, Morrum/Gravel, Ordinary Earth & Ballast Mining Project of… — environmental approval granted, 200 m away
- Proposed Road Metal, Morrum/Gravel, Ordinary Earth & Ballast Mining Project of… — environmental approval granted, 350 m away
- Proposed Road Metal, Morrum/Gravel, Ordinary Earth & Ballast Mining Project of… — environmental approval granted, 450 m away
- Proposed Road Metal & Building Stone Mining Project of Sri Jigireddy Vara Prasad — lapsed, 1.1 km away
- Sri Pappu Sri Aditya Reddy — lapsed, 1.7 km away
- Sri Padala N. Sekhar Reddy — lapsed, 1.8 km away
More from Lakshmi Ganapathi Civil Constructions in Kakinada