One of 4 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s RMC Readymix (India), A Division Of Prism Cement Limited
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 10 Dec 2025 |
| Application filed | 18 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Gopi Gopisetty |
| Land area | 12.1 acres (4.9 ha) |
| Project cost | ₹1.3 crore |
| Village / locality | Thummapala |
| Taluk / tehsil | Anakapalle |
| District | Anakapalli |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02276 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Jun 2026 | Lapsed | 12.1 acres | ₹1.3 crore |
| Amendment filed 22 Dec 2025 | Lapsed | 12.1 acres | ₹1.3 crore |
| Early planning filed 18 Oct 2025 (this page) | Cleared for impact study | 12.1 acres | ₹1.3 crore |
| New project filed 30 Nov 2023 | Environmental approval granted | 12.1 acres | ₹50 lakh |
In context
213 applications in Anakapalli since January 2022 are in the same category (Mining): 151 approved, 18 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.1 acres, this one is larger than 64% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 14.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 50 mining leases have applied within 5 km.
Where it is
Thummapala, Anakapalle, Anakapalli, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s RMC Readymix (India), A Division Of Prism Cement Limited — lapsed, 0 m away
- Mining project by M/s RMC Readymix (India), A Division Of Prism Cement Limited — lapsed, 0 m away
- Mining project by M/s RMC Readymix (India), A Division Of Prism Cement Limited — environmental approval granted, 50 m away
- Sri P. Appa Rao — cleared for impact study, 350 m away
- Sri Nama Krishnaiah — lapsed, 700 m away
- Sri P Sreedhar — environmental approval granted, 1.3 km away
- Smt. P.Neelima — environmental approval granted, 1.3 km away
- Mining project by M/s Nauha Constructions-2.500 Hectares — environmental approval granted, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.