One of 3 filings for this project. The project's main page, with every filing and where each stands: Sri Ch. Ajad Kumar
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Dec 2025 |
| Application filed | 22 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Ajad Kumar Chalasani |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹32 lakh |
| Village / locality | Paritala |
| Taluk / tehsil | Kanchikacherla |
| District | Ntr |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02414 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 31 Oct 2026 | Under environmental review | 15.3 acres | ₹1.9 crore |
| Amendment filed 3 Aug 2026 | Environmental approval granted | 14.6 acres | ₹1 crore |
| Validity extension filed 22 Sept 2025 (this page) | Environmental approval granted | 3.1 acres | ₹32 lakh |
In context
243 applications in Ntr since January 2022 are in the same category (Mining): 182 approved, 31 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.1 acres, this one is smaller than 84% of them.
6 other mining leases have applied within 500 m of this site; together with this one they cover 20.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 67 mining leases have applied within 5 km.
Where it is
Paritala, Kanchikacherla, Ntr, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. PVR CHALAPATHI METAL INDUSTRIES - 1.00 HA — lapsed, 100 m away
- Mining project by M/s PVR Chalapathi Metal Industries- 1.214HA — lapsed, 250 m away
- Mining project by M/s PVR Chalapathi Metal Industries - 0.979 — lapsed, 250 m away
- Mining project by M/s PVR Chalapathi Metal Industries -0.505 Ha — lapsed, 250 m away
- 1.500ha Road Metal and Gravel Mine of Millennia Minerals Prop: Sri Kanaparthy… — under environmental review, 300 m away
- Smt Parvathi Jasti — cleared for impact study, 450 m away
- Sri Chinta Mukesh — cleared for impact study, 650 m away
- Sri Ch. Ajad Kumar — under environmental review, 650 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.