Quick answers
What is this project?
This approved mining project by M/s Sundeep Ravindra Engineers & Contractors is in Ravada, Jiyyammavalasa, Parvathipuram Manyam, Andhra Pradesh. The site covers 4.4 acres.
Who is building it?
The applicant is Kovvuri Ravindra Reddy.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Jan 2026), as of 27 Nov 2026.
Where is it?
In Ravada, Jiyyammavalasa, Parvathipuram Manyam, Andhra Pradesh.
How big is it?
It has a stated cost of ₹42 lakh and a site of 4.4 acres.
When was it filed?
The application was filed on 14 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Jan 2026 |
| Application filed | 14 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kovvuri Ravindra Reddy |
| Land area | 4.4 acres (1.8 ha) |
| Project cost | ₹42 lakh |
| Village / locality | Ravada |
| Taluk / tehsil | Jiyyammavalasa |
| District | Parvathipuram Manyam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02437 |
In context
39 applications in Parvathipuram Manyam since January 2022 are in the same category (Mining): 29 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.4 acres, this one is smaller than 82% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 9.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Ravada, Jiyyammavalasa, Parvathipuram Manyam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri Satrucharla Parikshit Raju — environmental approval granted, 100 m away
- Sri S. Samba Murthy — cleared for impact study, 10 km away
- Mining of Koriseela Sand Reach — not approved, 16.1 km away
- Mining project by M/s Sri Venkata Siva Satya Stone Crusher — environmental approval granted, 16.1 km away
- Sri J.Rama Rao — more information requested, 16.1 km away
- Smt. K. Gowri — under environmental review, 16.3 km away
- Laying Underground Ofc Along the Roads Between " Jimidipeta-Gummidiguda-Anjana… — lapsed, 16.6 km away
- Sri D. Ramana Chitti — environmental approval granted, 17.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.