One of 2 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s SREE GRANITES
Project details
| Status | Withdrawn |
|---|---|
| Status since | 6 Jun 2025 |
| Application filed | 20 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | K Venkatesh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Gattappanayanipalle |
| Taluk / tehsil | Kuppam |
| District | Chittoor |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02455 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 30 Apr 2025 | Environmental approval granted | 2.5 acres | ₹20 lakh |
| Ownership transfer filed 20 Mar 2025 (this page) | Withdrawn | 2.5 acres | ₹30 lakh |
In context
364 applications in Chittoor since January 2022 are in the same category (Mining): 237 approved, 33 filed or under review, and 94 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 96% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 21.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 17 mining leases have applied within 5 km.
Where it is
Gattappanayanipalle, Kuppam, Chittoor, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s SREE GRANITES — environmental approval granted, 0 m away
- Mining project by M/s. Siva Sai Raj Constructions — cleared for impact study, 300 m away
- Mining project by M/s DP Structures LLP — cleared for impact study, 350 m away
- Mining project by M/s. SRI LAKSHMI VENKATESWARA STONE CRUSHER — environmental approval granted, 400 m away
- Mining project by M/s. G. M. GRANITES Prop. Sri. G. Mani Kanta-3.00 Ha — cleared for impact study, 1 km away
- Sri Kamalanathan Chidha Gounder — under environmental review, 1.2 km away
- M/s Shree Mahadeshwara Granites - Colour Granite Quarry — cleared for impact study, 1.2 km away
- M/s Shree Mahadeshwara Granites, Mg Partner: Sri K. Mohanbab, Extent: 4.965… — withdrawn, 1.2 km away