What is Developing? Open the mapMap

Cleared for impact studyIndustry · Ntr, Andhra Pradesh

Expansion of API (Bulk drug and intermediates) manufacturing unit at Plot. Nos. 80 to 85, 78, 79, 86 and 87, Tirumalagiri village, IDA Jaggaiahpet, NTR Krishna District, Andhra Pradesh by M/s. Dinakara Life Sciences Pvt. Ltd.

Expansion of API (Bulk drug and intermediates) manufacturing unit at Plot. Nos. 80 to 85, 78, 79, 86 and 87, Tirumalagiri village, IDA Jaggaiahpet, NTR Krishna District, Andhra Pradesh by M/s. Dinakara Life Sciences Pvt. Ltd is a proposed industrial project in Tirumalagiri, Jaggayyapeta, Ntr, Andhra Pradesh. The site covers 2.8 acres. Its stated project cost is ₹39.6 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 23 Jan 2026).

See it on the live map All projects in Ntr

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of API (Bulk drug and intermediates) manufacturing unit at Plot. Nos. 80 to…

Project details

StatusCleared for impact study
Status since23 Jan 2026
Application filed12 Dec 2025
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantDinakara Life Sciences Private Limited
Land area2.8 acres (1.1 ha)
Project cost₹39.6 crore
Village / localityTirumalagiri
Taluk / tehsilJaggayyapeta
DistrictNtr
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-02462

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 19 Jun 2026Environmental approval granted2.8 acres₹39.6 crore
Early planning filed 12 Dec 2025 (this page)Cleared for impact study2.8 acres₹39.6 crore

In context

40 applications in Ntr since January 2022 are in the same category (Industry): 20 approved, 7 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.8 acres, this one is smaller than 82% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Tirumalagiri, Jaggayyapeta, Ntr, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Dinakara Life Sciences Private Limited in Ntr

All 3 Dinakara Life Sciences projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.