Quick answers
What is this project?
Hotel Building construction project at Survey Nos. 1189 and 1190/4, Nellore Bit 2, Nellore Mandal, Nellore District, Andhra Pradesh by DSR Infrastructure Private Limited is an approved hotel project in Nellore, Andhra Pradesh. It plans 139 units in 1 tower of up to 8 floors on 2.1 acres.
Who is building it?
The applicant is DSR Infrastructure Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 May 2025), as of 27 Nov 2026.
Where is it?
In Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹169 crore and a site of 2.1 acres.
When was it filed?
The application was filed on 22 Jan 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 May 2025 |
| Application filed | 22 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | DSR Infrastructure Private Limited |
| Use | Hotel |
| Units | 139 |
| Towers | 1 |
| Floors (tallest) | 8 |
| Basements | 2 |
| Parking spaces | 315 |
| Land area | 2.1 acres (0.8 ha) |
| Built-up area | 34,135 m² (3,67,426 sq ft) |
| Plot area | 8,420 m² (90,632 sq ft) |
| Project cost | ₹169 crore |
| Village / locality | Nellore |
| Taluk / tehsil | Nellore |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02551 |
In context
11 applications in Nellore since January 2022 are in the same category (Buildings & townships): 8 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.1 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Apartment Building Construction Project - DSR Infrastructure… — environmental approval granted, 100 m away
- Bharath Singh Colony and Deenayal Nagar areas Open Sand Reach (25.00 Ha) — more information requested, 6.2 km away
- Bharath Singh Colony and Deenayal Nagar areas Open Sand Reach (25.00 Ha) — cleared for impact study, 6.2 km away
- Bharath Singh Colony and Deenayal Nagar Areas Open Sand Reach (25.00 Ha) for… — lapsed, 6.2 km away
- Leguntapadu Open Sand Reach 16.137 Ha — more information requested, 9.6 km away
- Leguntapadu Open Sand Reach 16.137 Ha — cleared for impact study, 9.6 km away
- Leguntapadu Open Sand Reach 16.137 Ha — lapsed, 9.6 km away
- Diversion of Forest land of Ac 16.67 Ha in LP No: 460,461 and 463 in Sy. No:… — under forest review, 12 km away
More from DSR Infrastructure Private Limited in Sri Potti Sriramulu Nellore
- Residential Apartment Building Construction Project - DSR Infrastructure… — environmental approval granted
All 3 DSR Infrastructure projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.