Quick answers
What is this project?
Classroom Instructional Facility (CIF) and School building by M/s. Gandhi Institute of Technology & Management at Rushikonda, Visakhapatnam, Andhra Pradesh is a proposed education project in Endada, Visakhapatnam (Rural), Visakhapatnam, Andhra Pradesh. The site covers 3.9 acres.
Who is building it?
The applicant is Gandhi Institute of Technology and Management.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 12 Oct 2025), as of 27 Nov 2026.
Where is it?
In Endada, Visakhapatnam (Rural), Visakhapatnam, Andhra Pradesh.
How big is it?
It has a stated cost of ₹946 crore and a site of 3.9 acres.
When was it filed?
The application was filed on 29 Aug 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Classroom Instructional Facility (CIF) and School building by M/s. Gandhi Institute of…
Project details
| Official title | Proposed construction of Classroom Instructional Facility (CIF) and School building by M/s. Gandhi Institute of Technology & Management at Rushikonda, Visakhapatnam, Andhra Pradesh. |
|---|---|
| Status | Cleared for impact study |
| Status since | 12 Oct 2025 |
| Application filed | 29 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Gandhi Institute of Technology and Management |
| Use | Education |
| Land area | 3.9 acres (1.6 ha) |
| Project cost | ₹946 crore |
| Village / locality | Endada |
| Taluk / tehsil | Visakhapatnam (Rural) |
| District | Visakhapatnam |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02554 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 5 Nov 2025 | Environmental approval granted | 3.9 acres | ₹946 crore |
| Early planning filed 29 Aug 2025 (this page) | Cleared for impact study | 3.9 acres | ₹946 crore |
In context
89 applications in Visakhapatnam since January 2022 are in the same category (Buildings & townships): 64 approved, 11 filed or under review, and 14 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 3.9 acres, this one is smaller than 64% of them.
52 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Endada, Visakhapatnam (Rural), Visakhapatnam, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Classroom Instructional Facility (CIF) and School building by M/s. Gandhi… — environmental approval granted, 0 m away
- Tourism Project at Rushikonda, Visakhapatnam District Andhra Pradesh by Andhra… — lapsed, 650 m away
- Asian Institute of Gastroenterology Private Limited, Phase-I — environmental approval granted, 700 m away
- New hotel building within the existing premises of M/s. Sai Priya Estates and… — coastal clearance granted, 800 m away
- Residential and Commercial building construction project by M/s. GCON Projects… — lapsed, 900 m away
- Diversion of 0.99 ha (Resort area : 0.97 ha and Road area : 0.02 ha) of Forest… — lapsed, 950 m away
- Mixed-use Project World Trade Center (WTC) Visakhapatnam located at Survey No.… — cleared for impact study, 1.1 km away
- CSIR-National Institute of Oceanography — lapsed, 1.2 km away
All 5 Gandhi Institute of Technology and Management projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.